|| || || || || || || ||
detailed solutions ||
UDC was required at time of installation for all systems installed after?
|| || || || || || || || || || ||
January 1, 2000 || ||
July 1, 2005, service techs shall possess or work under someone who has a current
|| || || || || || || || || || || || || || ||
certification indicating he or she has passed the? || || || || || || ||
ICC UST Service Technician Exam
|| || || ||
ICC cert must be renewed every?
|| || || || ||
24 months
||
Service techs must possess or be employed by a person who has the appropriate contractor's
|| || || || || || || || || || || || || || ||
license unless? ||
The individual has a tank testing license
|| || || || || ||
Service tech is defined by any individual who?
|| || || || || || ||
Tests UST monitoring equipment, trouble shoots UST systems, and/or installs UST
|| || || || || || || || || || ||
monitoring equipment. ||
,If the manufacturer training no longer exist, the local agency may?
|| || || || || || || || || ||
Approve comparable alternate training .
|| || || ||
UST includes?
||
Tank and connected piping
|| || ||
What is considered a UST?
|| || || ||
A petroleum storage tank.
|| || ||
What UST system meets the requirements for secondary containment?
|| || || || || || || ||
Doubled wall tanks || ||
According to title 23; the following piping components if installed after July 1, 1987 must
|| || || || || || || || || || || || || || ||
have secondary containment.
|| ||
Pressured product piping || ||
Considered "pipe" on tanks installed after July 1, 2003.
|| || || || || || || ||
Pressured product piping and below ground vapor recovery.
|| || || || || || ||
,Under dispenser containment (UDC) was required for all existing UST systems by
|| || || || || || || || || || ||
December 31, 2003 || ||
System for exchanging gas vapors in a storage tank and product in a fuel delivery truck
|| || || || || || || || || || || || || || ||
Stage 1 vapor recovery
|| || ||
An approved method for non-visual monitoring for existing UST systems.
|| || || || || || || || ||
Statistical Inventory Reconciliation (SIR)
|| || ||
ATG must be capable for detecting a release of?
|| || || || || || || ||
0.2 gallons per hour
|| || ||
What is no longer an approved method for non-visual monitoring on existing UST systems?
|| || || || || || || || || || || || ||
Manual inventory reconciliation.
|| ||
Automatic line leak detectors installed on underground piping with secondary containment
|| || || || || || || || || || ||
shall be capable of detecting a leak of ?
|| || || || || || || ||
3 gallons per hour at 10 psi
|| || || || || ||
How often should ATG be programmed to test the tank?
|| || || || || || || || ||
, At least monthly
|| ||
According to PEI RP 300, a combustible gas can be used to?
|| || || || || || || || || || ||
Detect vapor leaks in a vapor recovery system.
|| || || || || || ||
According to PEI RP 300, a written scope of work for vapor recovery installation should
|| || || || || || || || || || || || || || ||
include?
Construction plans ||
Positive shut off overfill protection device must stop the flow of fuel when the tank is no
|| || || || || || || || || || || || || || || || ||
more then? ||
95% full
||
According to Executive Order (EO) VR 201-A , what could cause a nozzle shut off
|| || || || || || || || || || || || || || ||
mechanism or malfunction? || ||
Depended filter seal damage || || ||
According to VR 201-A, breakaway reconnection must be?
|| || || || || || ||
Logged in GDF log || || ||
According to PEI RP 300 what is an INCORRECT method of documenting piping location?
|| || || || || || || || || || || || ||