{100% Correct} 2026 Latest!!!
1. The practice of placing windows or other transparent C
media and reflective surfaces so that during the day
natural light provides effective internal illumination is
referred to as:
A. Natural ventilation
B. Lighting power density
C. Daylighting
D. Passive ventilation
2. On a project with an older existing HVAC&R system A
that uses CFCs what can the project team do to earn
LEED certification?
A. Replace the CFCs with natural refrigerants
B. Purchase carbon credits
C. Replace the CFCs with Halons
D. Purchase Renewable Energy Certificates to offset
the CFC use
3. What are acceptable ways to use USGBC in text ac- C&D
cording to the USGBC Trademark Policy?
(CHOOSE 2)
A. United States Green Building Council
B. US Green Building Council
C. U.S. Green Building Council
D. USGBC
E. U.S. GBC
4. A vehicle must meet which requirement to be consid- C
ered low-emitting and fuel-efficient?
, LEED GA Practice Exam Correctly Solved Questions And Answers
{100% Correct} 2026 Latest!!!
A. Green Seal score of 40 or more
B. Green-e score of 40 or more
C. Green score of 40 or more
D. Green Label score of 40 or more
5. What statement is true about RECs? C
A. RECs are reduced from utility bills
B. RECs depreciate in value
C. RECs are tradable commodities
D. RECs provide electricity
6. Which LEED category has the greatest total number of C
points a project can earn?
A. Water Efficiency
B. Sustainable Sites
C. Energy and Atmosphere
D. Indoor Environmental Quality
7. Some wood flooring recovered onsite from a renova- A & C
tion project was refurbished and reused onsite. What
type of material is the wood flooring considered?
(CHOOSE 2)
A. Regional/local material
B. Recycled content
C. Salvaged material
D. Virgin wood
8. D
, Which of the following is a strategy to prevent storm
water runoff?
A. Locating the building 40 feet from a water body
B. Replacing native plants with turf grass to capture
and filter the water
C. Minimizing the quantity of open space in the project
boundary
D. Installing a vegetated roof
9. Which of the following are transient occupants? C&D
(CHOOSE 2)
A. Shift workers
B. Full time employees
C. Shoppers
D. College students in a classroom
E. Part-time receptionists
10. What project areas would you find the use of CFCs in? A & C
(CHOOSE 2)
A. Refrigeration
B. Hot water heating
C. Centrifugal chillers
D. Radiant flooring
11. What is an example of an ongoing operating cost? C
A. Design of a sedimentation control plan
B. Attorney fees for building contracts