Updat
2026 {Graded A+}
1. What rules should be used when selecting a LEED rat- 40/60
ing system when more than one system may apply? Use the rating system that
is most applicable
2. To verify the compliance of a credit or prerequisite, a Credit Forms
qualified member of the project team submits this
3. This source consumes the largest amount of energy in Space Heating
buildings
4. Legal protection of the ozone layer in the US is provid- Montreal Protocol
ed by this
5. 2009 LEED rating systems, except LEED for Homes and Credits,
LEED for ND, have what 3 structures? Minimum Program Re-
quirements,
Prerequisites
6. The Energy Policy Act establishes what flush rate as the 1.6 gallons per flush
baseline water consumption for water closets?
7. The Triple Bottom Line evaluates the human and envi- Social, economics, and en-
ronmental effects associated with these vironment
8. Construction and demolition debris cannot include 2 Rock, Soil
of these items
9. To qualify as a regional material, within what distance 500 miles
must a material be extracted, harvested, or recovered,
and manufactured?
10. For storage and collection of recyclables, a building Plastic, Cardboard, Metal
recycling program must include these items:
, LEED Green Associate Sample Exam Questions And Answers Latest
Updat
2026 {Graded A+}
11. To two primary responsibilities of the Green Building Provides third party LEED
Certification Institute (GBCI) are: professional credential-
ing, Provides third part
LEED project certification
12. Regional Priority credits are made available to the pro- The zip code of the ge-
ject for ographic location of the
project
13. The LEED project boundary is defined as The boundary description
that is submitted for certi-
fication
14. The 2009 LEED Rating System best suited for an office LEED for New Construction
complex where the owner will occupy 60% of the build- and Major Renovations
ing would be
15. The minimum FTE requirement per Minimum Program 1 FTE
Requirements (MPRs) for LEED Certification is
16. A popular program for comparing the energy perfor- ENERGY STAR
mance of multiple buildings
17. What is unique about the Innovative Performance re- It is not applicable to exist-
quirement for the Innovation in Design credit? ing or similar strategies in
the LEED rating system
18. The major consideration when developing a sustain- Life Cycle Costs
able project budget:
19. The EPAct 1992 water standard excludes which types residential and commer-
of fixtures and equipment? cial dishwashers, com-