Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

LEED GA Exam Questions And Answers Rated 100% Correct 2026 Updated!!

Rating
-
Sold
-
Pages
32
Grade
A+
Uploaded on
26-02-2026
Written in
2025/2026

LEED GA Exam Questions And Answers Rated 100% Correct 2026 Updated!!

Institution
LEED GA
Course
LEED GA

Content preview

LEED GA Exam Questions And Answers Rated 100% Correct 2026 Updated!!


1. 1) A In the LEED for Homes rating sys- 1) Right sizing is an important factor that will attect
tem, points are adjusted in all the cate- the energy demand of a project. The bigger the
gories according to the square footage building, the higher the energy demand; there-
of the home, which is called home fore, projects should not be developed larger
size adjustment (HSA). Thus, homes than their needs. In the LEED for Homes rating
that are bigger need to earn more system, points are adjusted in all categories ac-
points to achieve a LEED certification, cording to the square footage of the home; thus,
while smaller sized homes can become homes that are bigger need to earn more points
LEED-certified by earning fewer points. to achieve a LEED certification, while smaller sized
Other LEED rating systems do have not homes can become LEED-certified by earning
size adjustments. fewer points. Other LEED rating systems do have
not size adjustments. This adjustment factor is
called the:
a) Home size adjustment factor
b) Residential unit size adjustment factor
c) Sizing factor
d) LEED for Homes unit factor

2. 2) D team must choose credits to pur- Which level of LEED BD+C certification can a pro-
sue and collect more than 40 points. All ject receive by meeting all the Minimum Program
the MPRS and prereq- each rating sys- Requirements (MPRS), meeting all the prereq-
tem that are mandatory to achieve for uisites except one, and additionally earning 75
LEED certification. Then, the project points?
gram Requirements (MPRS) regardless a) Silver
of the rating system. Then there are b) Gold
prerequisites of In order to achieve c) Platinum
a LEED certification. Then, the project d) Cannot receive LEED certification
must choose credits to pursue and col-
lect more than 40 points. All the MPRs
and prereqs are mandatory

3.


, LEED GA Exam Questions And Answers Rated 100% Correct 2026 Updated!!

3) D Purchasing carbon offsets is ad- Which of the following strategies is not addressed
dressed by the Energy and Atmos- by the Materials and Resources credit category?
phere credit category. a) Cradle to-Cradle certified-products
b) Providing storage for durable goods such as
e-waste and furniture.
c) Developing a construction waste policy
d) Purchasing carbon ottsets

4. 4) A, Life-cycle costing assesses a prod- evaluates all the environ-
ucts total cost for the whole lifetime of mental ettects of a product quantitatively for the
the product by evalu- ating both the whole lifetime of that material.
initial price and the operating costs. a) Life-cycle assessment (LCA)
Embodied energy is the total ener- b) Life-cycle costing (LCC)
gy con- sumed resulting from a pro- c) Embodied energy
ducť's manufacturing, transportation, d) Triple bottom line
installation, and use. Triple bottom
line represents the 3 components that
every green building should establish:
economic prosperity (profit), social re-
sponsibility (people) and environmen-
tal stewardship (planet).

5. 5) C In LEED, projects cannot be di- 5) A 40 story mixed use development project con-
vided into different rating systems as tains a hotel on the first 20 floors, and residential
per sections, and the whole project units on the floors above 20. Which of the follow-
should be certified under one rating ing rating system(s) should the project team use
system. If the project seems applicable for the project?
to more than 1 rating system, 40/60 a) "LEED BD+C: Hospitality"
rule should be used to decide on the b) "LEED BD+C: New Construction and Major
rating system. In the 40/60 rule, pro- Renovation"
ject should be divided into sections c) Project team can either choose "LEED BD+C:
according to the appropriate rat- ing Hospitality", or "LEED BD+C: New Construction


, LEED GA Exam Questions And Answers Rated 100% Correct 2026 Updated!!

system each section fits. Then, the to- and Major Renovation"
tal floor area corresponding to each d) "LEED BD+C: Hospitality", and "LEED BD+C:
rating system should be calculated. If New Construction and Major Renovation" rating
the total floor area of one of the ap- systems should both be used
plicable rating system is less than 40%
of the project's total floor area, that
rating system cannot be used. If the
total floor area of one of the applica-
ble rating system is more than 60% of
the project's total area, that rating sys-
tem must be used. If it falls between
40% 60%, then the project teams can
decide on the rating system to be used
for the project. For this question, since
50% of the project is applicable to LEED
BD+C: Hospitality, and the other 50%
is applicable to LEED BD+C: New Con-
struction and Major Renovation, the
project team can choose which rating
system to use.

6. 6) A and B Photovoltaic (PV) panels 6) Installing photovoltaic (PV) panels on the roof
generate on-site renewable energy, of a building, can contribute to which of the fol-
and are categorized as active solar lowing? (Choose 2)
power systems. Because the PV panel a) Generation of on-site renewable energy
will absorb the solar heat and convert b) Reducing heat island ettect
it into electricity, hic uill also result in c) Reducing stormwater runott
the reduction of the heat island effect. d) Reducing building's heating loads
However, PV panels cannot make any
contribution to reducing stormwater
runoff, or the building's heating loads.



, LEED GA Exam Questions And Answers Rated 100% Correct 2026 Updated!!

7. 7) B and C Active solar: This type of so- 7) Which of the following cannot be considered
lar power converts sunlight into light, as a passive solar power? (Choose 2)
heat, or electricity. • PV panels convert a) Thermal mass
solar energy to electricity - Solar ther- b) Photovoltaic (PV) panels
mal collectors use the solar energy to c) Solar thermal collectors
heat air or water to be used for un- d) Building orientation
der- floor heating, heating and con- e) Using shades to prevent summer sun from
ditioning of air for buildings, and to heating the building
heat the swimming pools. Passive so-
lar: This type of solar power deals with
optimizing the project design to use
sunlight more effectively. As it is a pas-
sive strategy, its function is not about
generating energy from so- lar energy
via equipment. Below are types of pas-
sive solar; • Orienting the building to
maximize solar gains. • Using shades
that does not allow summer sun, but
allow winter sun into the building •
Creating thermal masses to store solar
heat can be examples of passive solar.

8. 8) A, Carbon offset is a reduction of 8) Which of the following represents a tradable,
carbon dioxide (CO2) made in order nontangible commodity associated with the qual-
to compensate, or offset an equivalent ities of renewable generation, and is proof that
carbon dioxide (CO2) emission made when purchased, an amount of Renewable En-
elsewhere. Carbon footprint refers to ergy Certificate (REC) energy was created using
the tion, transportation, or construc- renewable energy sources?
tion materials. Carbon neutrality, is a) Renewable Energy Certificate (REC)
to emit no more carbon measure of b) Carbon ottset
greenhouse gas emissions associated c) Carbon footprint
with an activity, such as construction, d) Carbon neutrality

Written for

Institution
LEED GA
Course
LEED GA

Document information

Uploaded on
February 26, 2026
Number of pages
32
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$20.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ElevatedExcellence Exam
Follow You need to be logged in order to follow users or courses
Sold
928
Member since
3 year
Number of followers
504
Documents
18333
Last sold
6 days ago
GETSOCIO EDUCATION

We have launched our assignments at a very reasonable price so that every student can enjoy its features. Our new method is gathering quite a positive feedback from the students, and many of our alumnus are fully satisfied with it. We would be glad if you purchase from us. THANK YOU!!

3.8

175 reviews

5
79
4
36
3
29
2
10
1
21

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions