Solutions
3D CAD is the same as BIM Correct Answers False
50% of the D.R. Horton construction team are graduates of the
LSU CM department Correct Answers True
A BIM design begins with intelligient objects such as walls,
roof, and windows Correct Answers True
A BIM file contains construction details, performance
characteristics, and product specs Correct Answers True
A BIM model cannot perform clash detection before the project
goes to the fiel Correct Answers False
A BIM model is a 3D representation of the physical and
functional characteristics of a building Correct Answers True
A change of process should trigger a training Correct Answers
True
A change order adjustment amount does not include general
overhead and profit Correct Answers False
A clean site is a safe site Correct Answers True
A clear expression of employee concern should be a policy
component of a safety manual Correct Answers True
,A good win-win example is using recycled concrete as a base
material for new roadways or driveways Correct Answers True
A poor quality design is not a contractor risk Correct Answers
False
A preparatory inspection is unnecessary to avoid miscues and
rework Correct Answers False
A project debriefing is not meant to be a training mechanism
Correct Answers False
A project is considered totally complete even if paperwork has
not been delivered to owner Correct Answers False
A project may go foward without paperwork Correct Answers
False
A public project has less governmental involvement than a
private project Correct Answers False
A risk mitigation plan happens before construction starts and
does not vary thereafter Correct Answers False
A stop sign is an example of an administrative control Correct
Answers True
A time extension is a contract adjustment used when a monetary
adjustment is not owed Correct Answers False
, According to the Brundtland definition of sustainable
developement, a sustainable society meets the needs of the
present without compromising the ability of future generations
to meet their own needs Correct Answers True
Additional time should always be asked for when processing a
change order Correct Answers True
After quality, safety is number one priority when managing
construction operations Correct Answers False
All BIM does is add a 3D component to 2D plans and specs
Correct Answers False
All construction risks have to do with jobsite events Correct
Answers False
An inspection is a check used when tracking quality Correct
Answers True
An objective of sustainability is to reduce consumption of
non-renewable resources, to minimize waste, and to create better
environments Correct Answers True
An OSHA vistit may be caused by an employee complaint
Correct Answers True
An overcrowded worksite does not affect productivity Correct
Answers False