Solutions
3D CAD is the same as BIM. Correct Answers False
50% of the D.R. Horton construction team are graduates of the
LSU CM department. Correct Answers True
A BIM design begins with intelligent objects such as walls, roof,
and windows Correct Answers True
A BIM file contains construction details, performance
characteristics, and product specs. Correct Answers True
A BIM model cannot perform clash detection before the project
does to the field. Correct Answers False
A BIM model is a 3D representation of the physical and
functional characteristics of a building. Correct Answers True
A BIM model serves as a shared knowledge resource for the
entire design and build team. Correct Answers True
A change order adjustment amount does not include general
overhead and profit. Correct Answers False
A claim can only be made after the project is complete. Correct
Answers False
A clean site is a safe site. Correct Answers True
,A clear expression of employee concern should be a policy
component of a safety manual. Correct Answers True
A company's managerial commitment should include safety.
Correct Answers True
A comprehensive quality control plan is the best way to control
quality during construction. Correct Answers True
A good win-win example is using recycled concrete as a base
material for new roadways or driveways. Correct Answers True
A job hazard analysis focuses on jobs and tasks. Correct
Answers True
A poor quality design is not a contractor risk. Correct Answers
False
A project control system utilizes the plans, specs, estimate, and
schedule. Correct Answers True
A project debriefing is not meant to be a training mechanism.
Correct Answers False
A project is considered totally complete even if paperwork has
not been delivered to the owner. Correct Answers False
A project may go forward without paperwork. Correct Answers
False
, A public project has less governmental involvement than a
private project. Correct Answers False
A risk mitigation plan happens before construction starts and
does not vary thereafter. Correct Answers False
A safety officer at a company must have authority to take
corrective actions if a hazard is identified. Correct Answers
True
A stop sign is an example of an administrative control. Correct
Answers True
A tailgate meeting to review safety procedures is risk
management. Correct Answers True
A zero-punch list should not be a goal of the project. Correct
Answers False
According to the Brundtland definition of sustainable
development, a sustainable society meets the needs of the
present without compromising the ability of future generations
to meet their own needs. Correct Answers True
Adding contingencies may be a pre-bid method to offset a risk.
Correct Answers True
Additional time should always be asked for when processing a
change order. Correct Answers True