"Standardize" is one of the 5 S's. Correct Answers T
A BIM design begins with intelligent objects such as walls, roof,
and windows Correct Answers True
A BIM model cannot perform clash detection before the project
goes to the field Correct Answers False
A BIM model is a 3D representation of the physical and
functional characteristics of a building Correct Answers True
A change of process should trigger a training Correct Answers
true
A change order adjustment amount does not include general
overhead and profit. Correct Answers F
A claim can only be made after the project is complete. Correct
Answers F
A comprehensive quality control plan is the best way to control
quality during construction Correct Answers True
A good win-win example is using recycled concrete as a base
material for new roadways or driveways. Correct Answers True
A job hazard analysis focuses on jobs and tasks Correct Answers
True
,A LEAN program generates value. Correct Answers T
A LEAN program, once initiated, is good for many years
without improvement. Correct Answers F
A preparatory inspection is unnecessary to avoid miscues and
rework Correct Answers False
A project may go forward without paperwork Correct Answers
false
A public project has less governmental involvement than a
private project Correct Answers
A tailgate meeting to review safety procedures is a risk
management Correct Answers True
A zero-punch list should not be a goal of the project. Correct
Answers F
Adding contingencies may be a pre-bid method to offset a risk.
Correct Answers True
Additional time should always be asked for when processing a
change order Correct Answers True
After quality, safety is the number-one priority when managing
construction operations. Correct Answers False
AHJ does not include permits and inspections. Correct Answers
F
, AHJ stands for local Authorities Having Jurisdiction. Correct
Answers T
All BIM does is add a 3D component to 2D plans and specs.
Correct Answers False
An inspection is a check used when tracking quality. Correct
Answers True
An objective of sustainability is to reduce consumption of
nonrenewable resources, to minimize waste, and to create better
environments. Correct Answers true
An OSHA visit may be caused by an employee complaint.
Correct Answers true
An overcrowded worksite does not affect productivity Correct
Answers False
Application for payments is made on an AIA G702 form.
Correct Answers T
Arbitration can be more expensive than litigation. Correct
Answers true
Archeological findings are not a risk of the contractor Correct
Answers False
As-built drawings are part of contract close-out. Correct
Answers T