Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Final Exam Review Questions (BCN3027) (Principles of Construction Management at FIU) Questions With Complete Solutions

Rating
-
Sold
-
Pages
37
Grade
A+
Uploaded on
01-03-2026
Written in
2025/2026

Final Exam Review Questions (BCN3027) (Principles of Construction Management at FIU) Questions With Complete Solutions

Institution
BCN 3027
Course
BCN 3027

Content preview

Final Exam Review Questions (BCN3027) (Principles of
Construction Management at FIU) Questions With
Complete Solutions

A project engineer is collecting data to help project manager
complete the bi-weekly project schedule update. Which of the
following data should s/he collect to update the progress of the
activities that have not started yet? (Select all that applies)

Expected Start
Nothing
Actual Start
Remaining Duration
Percent Complete Correct Answers Nothing

A project manager for a general contractor is working with the
company's accountant to prepare a cost control system for the
new building project the company recently won. They need your
help to identify whether the following costs are considered to be
direct or indirect costs:

Labor wages for general cleaning up of the project site Correct
Answers Indirect Cost

A project manager for a general contractor is working with the
company's accountant to prepare a cost control system for the
new building project the company recently won. They need your
help to identify whether the following costs are considered to be
direct or indirect costs:

,Labor wages for the carpenters framing the floor for the office
building Correct Answers Direct Cost

A project manager for a general contractor is working with the
company's accountant to prepare a cost control system for the
new building project the company recently won. They need your
help to identify whether the following costs are considered to be
direct or indirect costs:

Monthly progress payment for the electrical subcontractor
Correct Answers Direct Cost

A project manager for a general contractor is working with the
company's accountant to prepare a cost control system for the
new building project the company recently won. They need your
help to identify whether the following costs are considered to be
direct or indirect costs:

Premiums paid to the surety company to secure the required
bonding Correct Answers Indirect Cost

A project manager for a general contractor is working with the
company's accountant to prepare a cost control system for the
new building project the company recently won. They need your
help to identify whether the following costs are considered to be
direct or indirect costs:

The price of concrete bought from the mix plant to pour the
foundations Correct Answers Direct Cost

,A project manager for a general contractor is working with the
company's accountant to prepare a cost control system for the
new building project the company recently won. They need your
help to identify whether the following costs are considered to be
direct or indirect costs:

The rent of the backbone used for excavating to lay the
foundations Correct Answers Direct Cost

A project manager for a general contractor is working with the
company's accountant to prepare a cost control system for the
new building project the company recently won. They need your
help to identify whether the following costs are considered to be
direct or indirect costs:

The rent of the jobsite trailer Correct Answers Indirect Cost

A project manager for a general contractor is working with the
company's accountant to prepare a cost control system for the
new building project the company recently won. They need your
help to identify whether the following costs are considered to be
direct or indirect costs:

The salary of the project manager Correct Answers Indirect
Cost

A project team is planning to start laying the piping work two
days into excavation. Which of the following activity
relationships should be used to connect the excavations and pipe
laying activities?

, Finish-to-Finish
Finish-to-Start
Start-to-Finish
Start-to-Start Correct Answers Start-to-Start

Building codes establish rules and standards that control which
of the following?

1. Construction Methods
2. Building Materials
3. Building Design Correct Answers All of these answers

During which of the following project phases is a construction
cost estimate needed? (Select all that applies)

Feasibility Study
Design
Idea/Need
Bidding (i.e. procurement) Correct Answers Feasibility Study
Design
Idea/Need
Bidding (i.e. procurement)

Efficient or Effective: Eliminating unnecessary paperwork &
lengthy procedures Correct Answers Efficient

Efficient or Effective: Hiring a competent project manager
Correct Answers Effective

Efficient or Effective: Submitting a bid proposal for a project
within the company's experience Correct Answers Effective

Written for

Institution
BCN 3027
Course
BCN 3027

Document information

Uploaded on
March 1, 2026
Number of pages
37
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$19.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Classroom NURSING
Follow You need to be logged in order to follow users or courses
Sold
4911
Member since
4 year
Number of followers
3236
Documents
55585
Last sold
2 days ago
NURSING

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Read more Read less
4.0

1198 reviews

5
635
4
217
3
197
2
40
1
109

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions