Louisiana Residential Contractors License Exam Questions With Complete Solutions
What is the minimum compressive strength in psi for a concrete basement slab with negligible
weathering potential? - (ANSWER)2,500 PSI
An accessory structure is a structure not greater than _______ SF - (ANSWER)3,000 SF
What is the R Value insulation requirement for a residential floor climate zone 3? - (ANSWER)19
For a "Means of Egress Door", what is the minimum width of each door opening in inches? -
(ANSWER)32''
Exterior wood framing walls shall be a minimum of _____ grade wood. - (ANSWER)3
Which of the following is not considered work exempt from a permit?
Swings/Playground equipment
Sidewalks
Fences less than 6ft
interior painting - (ANSWER)Fences less than 6 ft
A permit becomes invalid if the work authorized by the permit does not begin in ____ days. -
(ANSWER)180 days
True or False the building Permit should be kept onsite until work is complete? - (ANSWER)True
When shall a final inspection be conducted? - (ANSWER)After permitted work is complete.
What is Required in a certificate of occupancy? - (ANSWER)Name and Address of Owner
Name of Building Official
Edition of the code permit was issued under
, Louisiana Residential Contractors License Exam Questions With Complete Solutions
Which is required on a site plan?
-location of new construction
- distance from lot lines
-traffic control plan
-location of existing structures - (ANSWER)Traffic Control Plan
How long must you retain approved construction documents after the work is completed? -
(ANSWER)180 days
Who is authorized to establish a refund policy for permit fees? - (ANSWER)Building Official
True or False You are allowed to continue work safely after a stop work order has been issued? -
(ANSWER)False
Who appoints the building official from the department of building safety? - (ANSWER)Chief Appointing
Authority of the Jurisdiction
When there is a conflict and different sections of the IBC specify different materials you must? -
(ANSWER)Use the most restrictive guidence
Live loads for floors and roofs must be posted by the owner when they exceed _______PSF -
(ANSWER)50 PSF
A Permit is not valid until? - (ANSWER)The fee has been paid
Who has the authority to authorize temporary utility connections? - (ANSWER)Building Official
True or False A detached 400 Square Foot storage shed does not require a permit? - (ANSWER)False
What is the minimum compressive strength in psi for a concrete basement slab with negligible
weathering potential? - (ANSWER)2,500 PSI
An accessory structure is a structure not greater than _______ SF - (ANSWER)3,000 SF
What is the R Value insulation requirement for a residential floor climate zone 3? - (ANSWER)19
For a "Means of Egress Door", what is the minimum width of each door opening in inches? -
(ANSWER)32''
Exterior wood framing walls shall be a minimum of _____ grade wood. - (ANSWER)3
Which of the following is not considered work exempt from a permit?
Swings/Playground equipment
Sidewalks
Fences less than 6ft
interior painting - (ANSWER)Fences less than 6 ft
A permit becomes invalid if the work authorized by the permit does not begin in ____ days. -
(ANSWER)180 days
True or False the building Permit should be kept onsite until work is complete? - (ANSWER)True
When shall a final inspection be conducted? - (ANSWER)After permitted work is complete.
What is Required in a certificate of occupancy? - (ANSWER)Name and Address of Owner
Name of Building Official
Edition of the code permit was issued under
, Louisiana Residential Contractors License Exam Questions With Complete Solutions
Which is required on a site plan?
-location of new construction
- distance from lot lines
-traffic control plan
-location of existing structures - (ANSWER)Traffic Control Plan
How long must you retain approved construction documents after the work is completed? -
(ANSWER)180 days
Who is authorized to establish a refund policy for permit fees? - (ANSWER)Building Official
True or False You are allowed to continue work safely after a stop work order has been issued? -
(ANSWER)False
Who appoints the building official from the department of building safety? - (ANSWER)Chief Appointing
Authority of the Jurisdiction
When there is a conflict and different sections of the IBC specify different materials you must? -
(ANSWER)Use the most restrictive guidence
Live loads for floors and roofs must be posted by the owner when they exceed _______PSF -
(ANSWER)50 PSF
A Permit is not valid until? - (ANSWER)The fee has been paid
Who has the authority to authorize temporary utility connections? - (ANSWER)Building Official
True or False A detached 400 Square Foot storage shed does not require a permit? - (ANSWER)False