252. What is a stair riser? a
a. Height of a step
b. Sides of the stairs
Choose the best answer c
to fill in the blank. The
permissible use of an
owner builder
authorization is ____________
a. To build the home solely
for commercial use
b. To use the newly built
home as a rental income
property
c. To occupy the home for
the applicant's personal
use for a least one year
d. To build the home for
market sale after
construction has
completed
,Exterior door framing b
requirements for forced
entry?
a. 2 studs on lock side
b. 2 studs on both sides
c. Single stud on lock side
d. Single stud on hinge
side
Flashing at intersection of 75 mm behind sheathing paper
roof and wall?
Flashing must be what? c
a. 1mm thick
b. 2mm thick
c. Resistance to corrosion
d. Resistance to acid
Heat is carried away b
through a concrete
foundation by?
a. Radiation
b. Conductive
c. Convection
d. Condensation
Horizontal security c
blocking required on
side(s) of framed doors?
a. One stud
b. Two studs
b. Locked side
c. Both sides
, How do you create a b
stress relief in concrete
without plastic or tooling?
a. Drill holes
b. Cut a score line
c. Pinch off the re-bar
d. Chisel
How to figure out if you c
require a sewage pump or
gravity fed? You need to
measure from...
a. Utilities to main floor
b. Utilities to contour lines
c. Utilities to basement
floor
In an energy efficient c
house what risk is there
with installing a 600-cfm
hood fan?
a. Requirement to add
make up air
b. Condensation may be
produced
c. Venting requirements
may cause heat loss
d. The hood may be
oversized for purpose
The performance of a c
specific task in a bar chart
is referred to as
a. A schedule
b. An event
c. An activity
d. A process
Answers
Save
Terms in this set (49)
252. What is a stair riser? a
a. Height of a step
b. Sides of the stairs
Choose the best answer c
to fill in the blank. The
permissible use of an
owner builder
authorization is ____________
a. To build the home solely
for commercial use
b. To use the newly built
home as a rental income
property
c. To occupy the home for
the applicant's personal
use for a least one year
d. To build the home for
market sale after
construction has
completed
,Exterior door framing b
requirements for forced
entry?
a. 2 studs on lock side
b. 2 studs on both sides
c. Single stud on lock side
d. Single stud on hinge
side
Flashing at intersection of 75 mm behind sheathing paper
roof and wall?
Flashing must be what? c
a. 1mm thick
b. 2mm thick
c. Resistance to corrosion
d. Resistance to acid
Heat is carried away b
through a concrete
foundation by?
a. Radiation
b. Conductive
c. Convection
d. Condensation
Horizontal security c
blocking required on
side(s) of framed doors?
a. One stud
b. Two studs
b. Locked side
c. Both sides
, How do you create a b
stress relief in concrete
without plastic or tooling?
a. Drill holes
b. Cut a score line
c. Pinch off the re-bar
d. Chisel
How to figure out if you c
require a sewage pump or
gravity fed? You need to
measure from...
a. Utilities to main floor
b. Utilities to contour lines
c. Utilities to basement
floor
In an energy efficient c
house what risk is there
with installing a 600-cfm
hood fan?
a. Requirement to add
make up air
b. Condensation may be
produced
c. Venting requirements
may cause heat loss
d. The hood may be
oversized for purpose
The performance of a c
specific task in a bar chart
is referred to as
a. A schedule
b. An event
c. An activity