Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SSM EXAM QUESTIONS AND ANSWERS. VERIFIED 2026.

Beoordeling
-
Verkocht
-
Pagina's
29
Cijfer
A+
Geüpload op
02-03-2026
Geschreven in
2025/2026

SSM EXAM QUESTIONS AND ANSWERS. VERIFIED 2026.

Instelling
SSM
Vak
SSM

Voorbeeld van de inhoud

SSM EXAM QUESTIONS AND ANSWERS.
VERIFIED 2026.




What is NYC Chapter 33?

What is Section 3301 and 3302? - ANS Ch 33 = Safeguards During Construction or Demoltion

3301 = General

3302 = Definitions



What do you do when code does not specifically state inspection is needed on an equipment? -
ANS [3301.4.1]

Any equipment (except hand tools) that affects safety of public or property shall be inspected by
a COMPETENT PERSON designated by the contractor using the equipment



This inspection shall be documented in an inspection checklist signed and dated by the CP



Who is responsible for maintaining construction/demo signs? - ANS [3301.9]

The permit holder for the construction/demo work

If no active permits, then the building owner




@COPYRIGHT 2026/2027 ALL RIGHTS RESERVED
1

,Name the (8) items that need to be listed on a Project Information Panel - ANS [3301.9.1]

1. Rendering, elevation drawing, or zoning diagram

2. "Work in Progress" Title and specifying zoning use

3. Anticipated project completion date

4. Property owner's corporate name, address, phone #

5. Website address or phone # to contact

6. GC name and phone #

7. "To anonymously report unsafe conditions..call 311" in English and Spanish

8. Primary project permit (laminated)



Where should the Project Information Panel be posted?

How high up? - ANS [3301.9.1.2]

On the fence on each perimeter

-if the perimeter is greater than 150ft, post at each corner

- posted 4ft high from the ground to the bottom edge of the panel



Name the specs of the Project Information Panel and the (2) exceptions - ANS [3301.9.1.4]

6 ft wide x 4 ft high

Exceptions:

1) for demo project = 2'-4" wide x 4ft high

2) Sites that have street frontage less than 60 ft = 55" wide x 36.5" high



What contents should be on the SWS parapet info panel? (3) - ANS [3301.9.2.1]

1) Street address of the site

2) Name of contractor responsible for site...if not, then the owner

@COPYRIGHT 2026/2027 ALL RIGHTS RESERVED
2

, 3) The statement "For more info, visit NYC.GOV/BUILDINGS"



Name the (4) requirements of posting SWS parapet info panel - ANS [3301.9.2.2]

1) Posted along the long axis of the SWS

2) Shall not be posted above/below parapet

3) Between 3-6 feet from the left edge SWS or property line

4) Centered above project info panel on Fence



What dimension shall the SWS parapet info panel be? - ANS [3301.9.2.4]

3 ft high x 6 ft wide



When do you need site safety orientation and refresher? - ANS [3301.11]

- Orientation needed for each worker at any site that requires SSM/SSC/superintendent

- Refresher is needed after (1) year for each worker still working at the same site



Who can conduct the site safety orientation and refresher? - ANS [3301.11.3]

A qualified person designated by the permit holder

This qualified person shall have ability to communicate with each worker



What contents should be included in site safety orientation and refresher? - ANS [3301.11.4]

1) A review of safety procedures and any hazardous activities to be performed at the site

2) Information pertaining to site safety training SST as required in Section 3321



Describe how the site safety orientation and refresher is recorded - ANS [3301.11.5]

Records shall be maintained by permit holder and kept at the jobsite

@COPYRIGHT 2026/2027 ALL RIGHTS RESERVED
3

Geschreven voor

Instelling
SSM
Vak
SSM

Documentinformatie

Geüpload op
2 maart 2026
Aantal pagina's
29
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
sirjoel Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
131
Lid sinds
1 jaar
Aantal volgers
13
Documenten
12791
Laatst verkocht
4 dagen geleden
Sirjoel

Here you will find all documents and package deals offered by sirjoel

3.6

18 beoordelingen

5
4
4
5
3
7
2
1
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen