Terms in this set (130)
1. One of the significant causes of Improper Installation
leaks in underground liquid storage
systems is ____________ ________________
2. Written Plans are required to obtain permits, solicit bids, and provide precise
guidance for installers.
3. The plans should Describe the property, identify the size and
location of the tanks, indicate the liquids to be
stored and provide the location of the dispensers
and piping.
4. Storage systems discussed in this Federal, state or local agencies.
recommended practice are usually
regulated by
5. All owners should ensure that the applicable regulatory requirements before being
equipment to be installed meets installed
https://quizlet.com/1150964540/u1-ust-installationretrofitting-exam-most-tested-questions-and-verified-solutionsget-it-100-accurate-2026-flash-cards/… 1/23
,3/3/26, 9:27 AM U1 UST Installation/Retrofitting EXAM, MOST TESTED QUESTIONS AND VERIFIED SOLUTIONS/GET IT 100% ACCURATE!! 202…
6. Consult the local authorities who finalized or construction is initiated.
have jurisdiction in the area before
storage-system plans are
7. All owners should ensure that the Being installed.
equipment to be installed meets all
applicable regulatory requirements
before
8. To avoid damage tanks must not dropped, dragged, or handled with sharp objects.
be
9. Tanks must not be dropped, Damage to the tank
dragged, or handled with sharp
objects to avoid
10. The only time tanks really should for inspections and testing.
be moved is when
11. If a tanks is damaged at all Repaired in accordance with the manufacture's
throughout the moving process it instructions.
must be
12. The proper way to move a tank is Lift lugs that are installed by the manufacturer.
by lifting it, using the
13. Tanks should be carefully lifted Cables or chains of adequate length.
and lowered using
14. When two lifting lugs are being 30 degrees.
used, the angle between the lifting
cable and vertical should be no
more than
https://quizlet.com/1150964540/u1-ust-installationretrofitting-exam-most-tested-questions-and-verified-solutionsget-it-100-accurate-2026-flash-cards/… 2/23
, 3/3/26, 9:27 AM U1 UST Installation/Retrofitting EXAM, MOST TESTED QUESTIONS AND VERIFIED SOLUTIONS/GET IT 100% ACCURATE!! 202…
15. Stockpile piping materials and Secure area
equipment in a _____________ _________ on
the job site
16. Confirm adherence to detected damage that could result in leakage or
specifications by reporting to the premature corrosion.
owner about any
17. Pressure test single-walled tanks 3 to 5
with _____ to _______ psig air pressure,
soaping all surfaces, seams and
fittings while inspecting for bubbles.
18. Air testing with over ___ psig (3 5 psig
Psig for 12-Ft. Diameter FRP tanks) is
hazardous and may damage the tank
19. Do not air test a tank that has flammable or combustible liquids
previously contained
20. Place ______ barricades at the ends Warning
of tanks being tested.
21. Avoid tank ends, man-ways, and Pressure
fittings while the tank is under
22. Release pressure in the tank gauges or test fittings.
before disconnecting any
23. Be aware some manufactures do Temperature changes
not tighten fittings to allow for
_____________ _____________ during shipping
and storage.
https://quizlet.com/1150964540/u1-ust-installationretrofitting-exam-most-tested-questions-and-verified-solutionsget-it-100-accurate-2026-flash-cards/… 3/23
U1 UST Installation/Retrofitting EXAM, MOST
TESTED QUESTIONS AND VERIFIED
SOLUTIONS/GET IT 100% ACCURATE!! 2026!!
Save
Terms in this set (130)
1. One of the significant causes of Improper Installation
leaks in underground liquid storage
systems is ____________ ________________
2. Written Plans are required to obtain permits, solicit bids, and provide precise
guidance for installers.
3. The plans should Describe the property, identify the size and
location of the tanks, indicate the liquids to be
stored and provide the location of the dispensers
and piping.
4. Storage systems discussed in this Federal, state or local agencies.
recommended practice are usually
regulated by
5. All owners should ensure that the applicable regulatory requirements before being
equipment to be installed meets installed
https://quizlet.com/1150964540/u1-ust-installationretrofitting-exam-most-tested-questions-and-verified-solutionsget-it-100-accurate-2026-flash-cards/… 1/23
,3/3/26, 9:27 AM U1 UST Installation/Retrofitting EXAM, MOST TESTED QUESTIONS AND VERIFIED SOLUTIONS/GET IT 100% ACCURATE!! 202…
6. Consult the local authorities who finalized or construction is initiated.
have jurisdiction in the area before
storage-system plans are
7. All owners should ensure that the Being installed.
equipment to be installed meets all
applicable regulatory requirements
before
8. To avoid damage tanks must not dropped, dragged, or handled with sharp objects.
be
9. Tanks must not be dropped, Damage to the tank
dragged, or handled with sharp
objects to avoid
10. The only time tanks really should for inspections and testing.
be moved is when
11. If a tanks is damaged at all Repaired in accordance with the manufacture's
throughout the moving process it instructions.
must be
12. The proper way to move a tank is Lift lugs that are installed by the manufacturer.
by lifting it, using the
13. Tanks should be carefully lifted Cables or chains of adequate length.
and lowered using
14. When two lifting lugs are being 30 degrees.
used, the angle between the lifting
cable and vertical should be no
more than
https://quizlet.com/1150964540/u1-ust-installationretrofitting-exam-most-tested-questions-and-verified-solutionsget-it-100-accurate-2026-flash-cards/… 2/23
, 3/3/26, 9:27 AM U1 UST Installation/Retrofitting EXAM, MOST TESTED QUESTIONS AND VERIFIED SOLUTIONS/GET IT 100% ACCURATE!! 202…
15. Stockpile piping materials and Secure area
equipment in a _____________ _________ on
the job site
16. Confirm adherence to detected damage that could result in leakage or
specifications by reporting to the premature corrosion.
owner about any
17. Pressure test single-walled tanks 3 to 5
with _____ to _______ psig air pressure,
soaping all surfaces, seams and
fittings while inspecting for bubbles.
18. Air testing with over ___ psig (3 5 psig
Psig for 12-Ft. Diameter FRP tanks) is
hazardous and may damage the tank
19. Do not air test a tank that has flammable or combustible liquids
previously contained
20. Place ______ barricades at the ends Warning
of tanks being tested.
21. Avoid tank ends, man-ways, and Pressure
fittings while the tank is under
22. Release pressure in the tank gauges or test fittings.
before disconnecting any
23. Be aware some manufactures do Temperature changes
not tighten fittings to allow for
_____________ _____________ during shipping
and storage.