Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Workday Pro Payroll

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
03-03-2026
Written in
2025/2026

Exam of 8 pages for the course ICC Masonry at ICC Masonry (Workday Pro Payroll)

Institution
Course

Content preview

ICC Masonry Exam



Which of the following is the standard specification for ASTM C 90; RCMCI 6th Edition, Section 2.2.1
loadbearing
concrete masonry units?


Which of the following grout admixtures is used to obtain Super plasticizer; RCMCI 6th Edition, Section 2.11.6
a high
slump with reduced water?

, Which of the following is the standard specification that ASTM C 1386; CI 530; Part 2, Section 2.3E. IBC
autoclaved aerated concrete masonry units must 2103.3
conform to for the strength class specified in the
contract documents?


Grout intended for use in the construction of engineered ASTM C 476; 2006 IBC
2103.12 and
empirically designed masonry structures must comply
with


The slump test for grout must be performed in ASTM C 1019; ASTM - C1019-03
accordance with



In what condition are grout specimens to be tested? Damp; ASTM - 1019-03


When the prism test method is being utilized, how long 28; 2006 IBC 2105.3.1
must the
prisms cure prior to being cut?


After construction and grouting, masonry test prisms 48 hours; ASTM - C 1314, Section 5.10
should not be
disturbed or moved for a minimum of


When field sampling grout, the elapsed time between 15 minutes; ASTM - C1019, Section 7.2.1
obtaining the
first and final portions of the sample shall not be more
than


If mortar compression tests are required, how many tests 1; RCMCI 6th Edition,
3.2.4 per day are to be taken for the three successive work
days at the start of the job?


Glass unit masonry shall not be laid at temperatures 60 degrees F; 2006 IBC 2104.3.2.1
below


What is the maximum mean daily temperature permitted 100 degrees F; 2006 IBC 2104.4.3
before newly constructed masonry must be fog sprayed
during curing?


When the temperature is below 40 degrees F, newly 24 hours; 2006 IBC 2104.3.3.3
constructed
masonry must be covered with a weather resistant
membrane for a
minimum of


After initial mixing, when the ambient temperature 2 hours; 2006 IBC 2104.4.2.1
exceeds 90
degrees F with a wind velocity over 8 mph, mortar used
in masonry
construction must be discarded after

Written for

Course

Document information

Uploaded on
March 3, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
profEve

Get to know the seller

Seller avatar
profEve Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
8
Member since
5 months
Number of followers
0
Documents
981
Last sold
2 weeks ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions