ICC INSPECTOR STUDY GUIDE NEWEST ACTUAL EXAM 2026 WITH 400 QUESTIONS AND 100% DETAILED ANSWERS GRADED A+

Institution
ICC INSPECTOR
Course
ICC INSPECTOR

Content preview

1|Page



ICC INSPECTOR STUDY GUIDE NEWEST
ACTUAL EXAM 2026 WITH 400 QUESTIONS
AND 100% DETAILED ANSWERS GRADED
A+

Which agency approves a site-specific variance which allows for an
alternative method of construction or monitoring: a.) The Regional
Water Quality Board
b.) The State Water Resources Control Board
c.) The Department of Toxic Substance Control
d.) The local agency - ANSWER>>a.) The Regional Water Quality Board
CCR Title 23, Sec 2681(a)

The regulations to enforce compliance of underground storage tank
systems in the state are found in?
a.) Code of Federal Regulations, 40 CFR Part 281
b.) California Code of Regulations, Title 23, Chapter 16
c.) Code of Federal Regulations, 40 CFR Part 280
d.) California Code of Regulations, Title 23, Chapter 17 - ANSWER>>b.)
California Code of Regulations; Title 23, Chapter 16

By definition an "underground storage tank system" includes a.)
The tank, all connected piping and dispensers
b.) The tank, all connected piping, ancillary equipment and containment
syst em
c.) Only the tank
d.) Only tanks totally beneath the surface of the ground - ANSWER>>b.)
The tank, all connected piping, ancillary equipment and containm ent
syst em

,2|Page




(H&SC, Sec 25281(z))

The written report submitted to the local agency after an unauthorized
release is required to include the following except:
a.) Description of actions taken to stop the release
b.) Cause of the release
c.) Method of disposal of released product
d.) Date on which the release was discovered - ANSWER>>b.) Cause of
the release
CCR Title 23, Sec 2652(c)

An unauthorized release which does not escape from secondary
containment only requires a record on the operator's monitoring reports
provided:
A. It did not increase the hazard of fire
B. It did not cause any deterioration of the secondary containment
C. It was cleaned up within 8 hours of detection
D. All of the above - ANSWER>>D. All of the above
H&SC, Sec 25294

The annual monitoring certification may be performed by: A.
A person possessing the appropriate contractors licenses
B. An individual trained and certified by the manufacturer of the monitoring
equipment
C. A designated UST operator
D. A person who meets the requirements of both a and b - ANSWER>>D.
A person who meets the requirements of both a and b
CCR Title 23, Sec 2715(i)

,3|Page


When an automatic tank gauge is utilized for single-walled tank leak
detection, it shall generate a post-test hard copy data report of the
following information, except: a.) Liquid volume b.) Fuel depth
c.) Outside air temperature
d.) Time and date of test - ANSWER>>c.) Outside air temperature
CCR Title 23, Sec 2643(b)(1)
If a UST system is utilizing an overfill alarm, the alarm must be triggered to
alert the transfer operator when the tank is no more than full
a.) 85%
c.) 90% b.) 95%
d.) 80% - ANSWER>>c.) 90%
An automatic tank gauge is
utilized for leak detection of the . a.)
Tank
b.) Tank and Piping
c.) Piping
d.) Interstitial space - ANSWER>>a.) Tank CCR Title 23, Sec 2643(b)(1)

After completion of enhanced leak detection (ELD) test, the ELD test
results must be submitted to the . a.) The local
agency
b.) The SWRCB
c.) Owner of the UST system
d.) To both the SWRCB and the local agency - ANSWER>>d.) To both the
SWRCB and the local agency
CCR Title 23, Sec 2644.1(a)(5)

A permit to operate a UST system must have all of the following listed on
the permit, EXCEPT:
a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank capacity
c.) Permit expiration date

, 4|Page


d.) Monitoring requirements - ANSWER>>b.) Name of the tank
manufacturer and tank capacity
CCR Title 23, Sec 2712(c)

A temporary closure is appropriate for which of the following:
a.) The UST system is empty and will be removed from service indefinitely
b.) The UST system has ceased to store hazardous materials but will be
used within the next 12 consecutive months
c.) The UST system is unable to meet compliance requirements and will be

Written for

Institution
ICC INSPECTOR
Course
ICC INSPECTOR

Document information

Uploaded on
March 3, 2026
Number of pages
145
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$22.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AcademicsExcellence Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
177
Member since
1 year
Number of followers
27
Documents
7244
Last sold
2 days ago
Academic Excellence | Study Guides & Solutions

Dear Students, We have vast range of test banks and solution manuals of all topics, If you need any solution manual, testbank for testbooks do contact us anytime, save your time and effort and let you definitely understand what you are studying and get an amazing marks as well. Contact us 24/7 :

4.3

324 reviews

5
208
4
40
3
60
2
7
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions