1. True or False? A labor laws placard must be posted. True
2. True or False? The GC shall ensure that all sub- True
contractors and their workers have secured, main-
tained, and complied with all required licenses,
permits and certificates relating to, or otherwise
necessary or appropriate for, the performance and
completion of the work and all other activities and
obligations under the Contract Documents.
3. Which of the following is required to be present at All of the above
the job site?
A. Safety Manual and up to date MSDS binder
B. SWPP certificate posted
C. Visitors sign in book
D. All of the Above
4. The SWPP implementation sequence may be mod- After consulting with the project
ified? SWPP Designer (CEC) and, if re-
quired, the Project Owner and
receiving written approval.
5. True or False: the GC doesn't need to worry about False
access control after possession.
6. When installing perimeter BMP controls: Note locations and dates of in-
stallation on the site map.
7. A SWPP Site Map will show all of the following B. Notices of Violation C
except:
A. Locations of BMPs
B. Notices of Violation
1/9
, SWPP Walmart Test Questions And Answers With Verified Solutions 2026
Updated
C. Phasing and Sequence
D. Limits of Disturbance
8. In what circumstances must your company run Any new hire employees who
newly hired employees through E-Verify? will provide services to Walmart
in a mandatory E-Verify State:
AL, AZ, GA, LA, MS, NC, SC, TN or
UT.
9. Factors to consider when creating your schedule Account for the time it takes to
include: install or implement BMP's be-
tween each phase of construc-
tion
10. Which of the following is not a silt fence related C. Trackout
deficiency?
A. Tears or holes in the fabric
B. Excessive sediment accumulation
C. Track out
D. Undercutting
11. Requirements for managing stormwater activity NPDES
on a construction site are outlined in the following
regulation:
12. True or False: Subcontractors do not need a GC False
badge during the first week of construction as this
is the slowest time of the project.
13. Runoff Controls include all but which of the follow- A. Rolled erosion control prod-
ing: ucts
A. Rolled erosion control products