1. The 1970s law that set into place the regulation of The clean water act
stormwater is
2. Requirements for managing stormwater activity NPDES
on a construction site are outlined in the following
regulation
3. Which of the following is never an allowable Discharge from contaminated
stormwater discharge from a construction site ground water
4. The notice of termination can be filed when All construction activity, inside
and outside of the building, is
complete and permanent stabi-
lization has been verified as ad-
equate to meet permit require-
ments
5. Relative to stormwater permitting all of the follow- Submit the notice of termination
ing must occur before construction starts except (NOT)
6. The stormwater notice of intent (NOI) must be sub- After the SWPPP is prepared and
mitted before starting construction
7. Potential pollutant sources stored on a construc- 1. Petroleum storage tanks
tion site may include 2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE
8. The SWPPP inflammation sequence may be modi- After consulting with the project
fied SWPPP Designer (CEC) and, if
required, the project owner and
receiving written approval
1/8
, DVP SWPPP Exam Questions And Answers Verified 100% Correct 2026!!!
9. A SWPPP site map will show all of the following Notices of violation
except
10. Which of the following information is to be posted 1. Construction site notice
at the entrance of the site 2. Permit authorization
3. Location of SWPP
4. ALL OF THE ABOVE
11. Which of the following is NOT A beneficial use of Flushing a spill down a storm
water drain
12. When installing and maintaining a check dam The low point (overflow) of the
make sure check dam is in the middle of the
channel
13. To reduce the possibility of undercutting in chan- Install filter fabric under rock
nels, you should and similar materials placed
within the stormwater con-
veyance
14. The good housekeeping section of the SWPP must Post construction stormwater
include all BUT which of the following management procedures
15. Runoff controls include all but which of the follow- Rolled erosion control products
ing
16. Which erosion control best management practice Vegetation
increases water filtration, dissipates rainfall energy
and slows over flow of stormwater
17. Of the following factors that influence erosion Groundcover
rates, the one a contractor has the most control
over (only select one) is
2/8