1. A written inspection and report of wood destroying pests and
organisms shall be delivered in how many days from the date of
inspection Answer: 10 Business Days
2. The address of each property inspected or upon which work is
completed shall be reported and filed with The Board how many
days after the commence- ment of inspection Answer: 10 Business
Days
3. It is unlawful for a registered company to solicit payment from the
consumer for any structural fumigation work not actually rendered
unless prior to the authorization the consumer is provided what notice?
Answer: Notice Answer: the charge for service that this company subcontracts to
another registered company may include the company's charges for arranging and administering such
service that are in addition to the direct costs associated with paying the subcontractor. You may accept
(company's name) bid or you may contract directly with another registered company licensed to
perform the work.
4. In order for a registered company or licensee to commence work
on a contract, or sign, issue, or deliver any documents expressing an
, Contact for further consultation
opinion or statement relating to the absence or presence of wood
destroying pests or organisms, what must first take place? Answer: An
inspection has to have been made by a licensed Branch 3 Field Representative or
Operator.
5. What is the monetary disciplinary action for failure to report and
file with The Board the address of any property inspected or where
work completed pursuant to section 8518? Answer: A fine of not more than
$2,500.
6. What is a reinspection Answer: An inspection of those items previously listed on an original
report to determine if the recommendation(s) has (have) been completed
7. For how long is an original inspection valid? Answer: Four months
8. A registered company has how many days to perform an
inspection after inspection is ordered? Answer: 10 business days
9. What is a separated report? Answer: A report in which the registered company
separately identifies each recommendation for corrective measures for each section 1 item
(infestation and/or infection that is evident) and for each Section 2 item (condition deemed likely to lead
to infestation or infection) that is present.
10. What is a Control Service when related to Wood Destroying
, Contact for further consultation
Organisms Answer: A regular reinspection of a property after a report has been made in
compliance with section 8516.