S-56 Fire Safety Manager Exam Questions with
100% Correct Answers | Verified | Updated
(Actual Exam)
Save
Terms in this set (57)
Standpipe maintained under Maintained as needed
pressure and equipped with low
pressure alarm
Standpipe including piping leading Daily
to FD connection, inspected
visually
construction drawings used to Daily
confirm routing of unexposed
standpipe sections
FDNY/CSFM daily reports must be Daily
kept by documenting standpipe
inspections, fire extingusher
inspections,and upkeep permit logs
FDNY first responders box daily, quarterly
maintenance and execution
evacuation drills
standpipe pressurizing system, and weekly
alarm tested
, licensed plumber/ fire suppression during alarm installation
contractor perform air/water test of
standpipe
standpipe alarm installation during alarm installation
documented by CSFM
standpipe alarm soundings logged per incident
and documentation includes
description of response to alarm
standpipe repaired and retested after failed biweekly inspection
until retesting is successful after
filed bi-weekly test by licensed
plumber/fire suppression
subcontractor. Repairs documented
sprinkler systems for use at maintained as needed
construction sites shall be
provided, maintained and made
available for FD use
CSFM shall be responsible for daily
verifying FDNY hot work permit and
supervising the issuance of
authorizations for hot work
operations
a fire guard is required at each hot daily
work operation while in progress
and shall continue on site for
minimum of 30 minutes after each
hot work operation is complete. A
log book shall be maintained on
site
100% Correct Answers | Verified | Updated
(Actual Exam)
Save
Terms in this set (57)
Standpipe maintained under Maintained as needed
pressure and equipped with low
pressure alarm
Standpipe including piping leading Daily
to FD connection, inspected
visually
construction drawings used to Daily
confirm routing of unexposed
standpipe sections
FDNY/CSFM daily reports must be Daily
kept by documenting standpipe
inspections, fire extingusher
inspections,and upkeep permit logs
FDNY first responders box daily, quarterly
maintenance and execution
evacuation drills
standpipe pressurizing system, and weekly
alarm tested
, licensed plumber/ fire suppression during alarm installation
contractor perform air/water test of
standpipe
standpipe alarm installation during alarm installation
documented by CSFM
standpipe alarm soundings logged per incident
and documentation includes
description of response to alarm
standpipe repaired and retested after failed biweekly inspection
until retesting is successful after
filed bi-weekly test by licensed
plumber/fire suppression
subcontractor. Repairs documented
sprinkler systems for use at maintained as needed
construction sites shall be
provided, maintained and made
available for FD use
CSFM shall be responsible for daily
verifying FDNY hot work permit and
supervising the issuance of
authorizations for hot work
operations
a fire guard is required at each hot daily
work operation while in progress
and shall continue on site for
minimum of 30 minutes after each
hot work operation is complete. A
log book shall be maintained on
site