The SWPPP implementation sequence may be modified? - ANSWER After consulting with
the project SWPPP designer (CEC) and if required, the project owner and receiving
written approval.
A SWPPP site map will show all of the following? - ANSWER Location of BMP's, Phasing
& Sequence, Limits of Disturbance
When should temporary stabilization be implemented? - ANSWER Immediately on all
disturbed areas that remain inactive for 14 days plus.
NPDES ANSWER Requirements for managing storm water activity on a construction site
are outlined in the following regulation
What are some common types of erosion? - ANSWER Gully, Sheet, and Rill
What does proper spill management include? - ANSWER Fully stocked, proper location,
signage, and labeling.
Clean Water Act ANSWER The 1970's law that set into place the regulation of storm water
What is the primary purpose of a construction exit? ANSWER To remove sediment from