Comprehensive Resource To Help You Ace 2026-2027
Includes Frequently Tested Questions With ELABORATED
100% Correct COMPLETE SOLUTIONS
Guaranteed Pass First Attempt!!
Current Update!!
1. A properly designed and installed septic system protects which vital resource for future
generations?
A. Surface minerals
B. Irrigation reserves
C. Drinking water
D. Stormwater drainage
Correct Answer: C
2. No person may begin physical development of a lot requiring an on-site sewage
management system without first obtaining a construction permit from the:
A. Building Inspection Office
B. Environmental Health Section
C. Public Works Department
D. Zoning Commission
Correct Answer: B
3. The application for an on-site sewage permit must be submitted by the:
A. County inspector
B. Plumbing contractor
,C. Property owner or developer
D. Excavation company
Correct Answer: C
4. A permit application must identify the type of _____ to be served.
A. Occupancy
B. Facility
C. Soil
D. Foundation
Correct Answer: B
5. The application must also specify the type of _____ supply.
A. Electrical
B. Gas
C. Water
D. Sewer
Correct Answer: C
6. Permit applications must include the number of _____ or estimated gallons per day of
sewage flow.
A. Bathrooms
B. Bedrooms
C. Occupants
D. Fixtures
Correct Answer: B
7. Any facility having occupancy for ______ or more must provide an approved on-site sewage
management system.
A. Two persons
B. Two hours
, C. Two days
D. Two units
Correct Answer: B
8. For facilities not served by water under pressure, which of the following is an acceptable
sewage disposal method?
A. Lagoon system
B. Pit privy
C. Holding tank
D. Compost trench
Correct Answer: B
9. Any repairs, replacements, or additions to an existing system must be:
A. Documented and photographed
B. Permitted and inspected
C. Engineered and surveyed
D. Approved by neighbors
Correct Answer: B
10. After completing the application process, what occurs next?
A. Soil excavation
B. System installation
C. Site inspection
D. Tank delivery
Correct Answer: C
11. During a site inspection, the inspector evaluates soil characteristics, absorption rates, and:
A. Utility access
B. Groundwater conditions