EXAM COVERAGE
CSLB C-13 Fencing Contractor Exam (Trade)
Planning & Estimating - Reading plans, material take-offs,
cost estimation, job layout
Codes & Regulations - California building codes, zoning,
safety compliance, pool barrier laws
Site Preparation - Soil conditions, grading, post spacing,
layout accuracy
Fence Types & Materials - Wood, chain-link, vinyl/PVC,
,ornamental iron, composite
Post Installation - Concrete setting, depth requirements,
alignment, anchoring systems
Gates & Hardware - Hinges, latches, closers, automatic
gate operators basics
Concrete & Footings - Mixing, curing, reinforcement
basics
Tools & Equipment - Power augers, levels, saws, welders,
safe operation
Welding & Metal Fabrication Basics - MIG/stick welding
fundamentals for fencing
Safety Practices - OSHA standards, PPE, trench safety,
equipment handling
Repair & Maintenance - Replacing panels, post repair, rust
,prevention
Job Supervision & Quality Control - Inspection standards,
finishing, customer specifications
Typical fence line posts should be set in undisturbed earth
by _______.
A. Shoveling
B. Drilling
C. Driving
D. None of the above
D. B or C
, Properly stretched fabric won't ___.
A sag
B shrink
C hang
D A or C
In accordance with specifications, "clearing the fence line"
consists of:
A. Removing old Fences
B. Removal and disposal of trees
C. Removing logs and brush
D. All the above