Contract - ✔✔A written document that states the legal obligations of the customer and the
|| || || || || || || || || || || || || || ||
contractor
Material List - ✔✔Contains all of the installation items by description, catalog number,
|| || || || || || || || || || || || ||
quantity, unit price, and total price. || || || || ||
Scope of Work (SOW) - ✔✔Covers the requirements for the ICT systems team and list all the
|| || || || || || || || || || || || || || || || ||
elements of the installation || || ||
Project Log - ✔✔A place to record detailed notes on any issue that arise
|| || || || || || || || || || || || ||
Submittals - ✔✔A form of communication between the contractor and owner defining the
|| || || || || || || || || || || || ||
specifics of how a job will be undertaken
|| || || || || || ||
A Drawings - ✔✔Architectural drawings indicate all physical aspects of the building.
|| || || || || || || || || || ||
Includes - Wall types, elevation, rated construction (Fire and Smoke), reflected ceiling plans,
|| || || || || || || || || || || || ||
door hardware, exact floor penetrations dimensions, cabinetry, and furnishings.
|| || || || || || || ||
M Drawings - ✔✔Mechanical drawings indicate the size and route of HVAC system ducts, air
|| || || || || || || || || || || || || || ||
handler units, chilled water piping, and refrigerant piping within structures.
|| || || || || || || || ||
E Drawings - ✔✔Electrical drawings indicate where the electrical services are installed inside
|| || || || || || || || || || || || ||
the building and the pathways that may be installed by the electrical contractor for the
|| || || || || || || || || || || || || || ||
cabling installation team. || || ||
, Includes - Grounding system, supporting structures, floor boxes, cable tray, surface raceway,
|| || || || || || || || || || || ||
poke-thru, duct banks. || ||
P Drawings - ✔✔Plumbing drawings indicate the size and route of portable water, specialized
|| || || || || || || || || || || || || ||
water, sanitary sewer, and rainwater roof drain piping within structures.
|| || || || || || || || ||
FP Drawings - ✔✔Fire Protection drawings indicate the size and route of the fire suppression
|| || || || || || || || || || || || || || ||
system piping and associated fire suppression agent heads and nozzles within structures.
|| || || || || || || || || || ||
T Drawings - ✔✔Telecommunication, security, and audio-visual drawings indicate the
|| || || || || || || || || ||
telecom work area outlet location, pathways, distribution room, TR Space layouts, and media
|| || || || || || || || || || || || ||
required for the project. || || ||
S Drawings - ✔✔Structural drawing indicate the location of all components of the building
|| || || || || || || || || || || || || ||
structure itself. ||
Includes - Steele beams, concrete floors, exterior walls, and other components that make up
|| || || || || || || || || || || || || ||
the basic structure.
|| ||
Service Drawings - ✔✔Which integrate M, E, P, and T drawings to mitigate the risk of
|| || || || || || || || || || || || || || || ||
collision or obstruction by different systems.
|| || || || ||
T0 Drawings - ✔✔Campus or Site plans - Exterior pathways and intrabuilding systems.
|| || || || || || || || || || || ||
T1 Drawings - ✔✔Layout of complete building per floor - serving zone boundaries, backbone
|| || || || || || || || || || || || || ||
distribution systems, and horizontal pathways. || || || ||