Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CTS-I EXAM QUESTIONS COMPLETE WITH 100% VERIFIED ANSWERS

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
06-03-2026
Written in
2025/2026

CTS-I EXAM QUESTIONS COMPLETE WITH 100% VERIFIED ANSWERS .Before developing a project plan, it is important to (CH3) - ANSWERS-have a clear understanding of the scope of work .A scope statement should include: (CH3) - ANSWERS-Both in-scope and out-of-scope items .The key elements of a project should be driven by: (CH3) - ANSWERS-the client's need .What is a dependency within a project task schedule? (CH3) - ANSWERS-A task that cannot begin before another task has been completed .Project budget refers to what? (CH3) - ANSWERS-The amount of labor and materials the project manager has allocated to complete the project. .A primary reason for attending construction meetings is to: (CH3) - ANSWERS-Identify changes to the original design that will affect the av installation. .In the event of a change in the placement of air-conditioning ducts in a boardroom, which of the following documents should the AV integrator submit first? (CH3) - ANSWERS-RFI .Which of the following documents should an AV integrator submit in the event that a manufacturer has discontinued a projector model? (CH3) - ANSWERS-RFC .The ANSI/INFOCOMM 2M-2010 Standard Guide for AV Systems Design and Coordination Process lays out a procedure for determining the_________ (CH3) - ANSWERS-project communication that needs to take place on a given project. .After which of the following activities is an AV project completed? (CH3) - ANSWERS-System closeout activities are completed .Which set of drawings should you reference to view the ductwork that goes through the building? - ANSWERS-Mechanical Drawings .Which set of drawings should you reference to locate a power outlet for a video display? - ANSWERS-Electrical Drawings .Which of the following must the as-built drawings show? - ANSWERS-Details of the system as finally installed .OFOI - ANSWERS-Owner Furnished Owner Installed (you will not need to install) .What does an elevation flag on a plan drawing indicate? - ANSWERS-Related elevation drawings .What type of drawing would you use to find out exactly how the projector should be mounted to the ceiling? - ANSWERS-Detail Drawing .Which of the following is the AV team likely to perform during new construction? - ANSWERS-• Install sprinkler system • Run cables and install mounts - Answer • Mount drop ceiling • Build the firewall .What is the primary reason an AV installer should attend weekly construction meetings? - ANSWERS-ID changes that affect the AV installation .Which of the following is the most important consideration during the installation of AV systems in a client-occupied space? - ANSWERS-Avoiding disruptions to your client's business .What is the first step in conducting a technical site survey? - ANSWERS-Reviewing AV drawings with the AV designer .What are best practices when evaluating facility conditions of a space that is ready for installation? - ANSWERS-• Note areas that may impact logistics • Make sure the site is clean and dust free • Take pictures and document all existing conditions • Note if you will need an extension ladder .Which statement accurately describes what you should do when de-installing existing equipment? - ANSWERS-Call an electronic waste recycling contractor after confirming with client they are not keeping old equipment. .If existing components have to be reused in a system, what is a critical task that the installer must perform? - ANSWERS-Test the equipment to makes sure it is operational .Which organization's general safety codes and regulations must you follow when visiting a job site? - ANSWERS-The AHJ (authority having jurisdiction)

Show more Read less
Institution
CTS-I
Course
CTS-I

Content preview

CTS-I EXAM QUESTIONS COMPLETE
WITH 100% VERIFIED ANSWERS



\.Before developing a project plan, it is important to (CH3) - ANSWERS✔-have a clear
understanding of the scope of work



\.A scope statement should include: (CH3) - ANSWERS✔-Both in-scope and out-of-scope items



\.The key elements of a project should be driven by: (CH3) - ANSWERS✔-the client's need



\.What is a dependency within a project task schedule? (CH3) - ANSWERS✔-A task that cannot
begin before another task has been completed



\.Project budget refers to what? (CH3) - ANSWERS✔-The amount of labor and materials the
project manager has allocated to complete the project.



\.A primary reason for attending construction meetings is to: (CH3) - ANSWERS✔-Identify
changes to the original design that will affect the av installation.



\.In the event of a change in the placement of air-conditioning ducts in a boardroom, which of
the following documents should the AV integrator submit first? (CH3) - ANSWERS✔-RFI



\.Which of the following documents should an AV integrator submit in the event that a
manufacturer has discontinued a projector model? (CH3) - ANSWERS✔-RFC

, \.The ANSI/INFOCOMM 2M-2010 Standard Guide for AV Systems Design and Coordination
Process lays out a procedure for determining the_________ (CH3) - ANSWERS✔-project
communication that needs to take place on a given project.



\.After which of the following activities is an AV project completed? (CH3) - ANSWERS✔-System
closeout activities are completed



\.Which set of drawings should you reference to view the ductwork that goes through the
building? - ANSWERS✔-Mechanical Drawings



\.Which set of drawings should you reference to locate a power outlet for a video display? -
ANSWERS✔-Electrical Drawings



\.Which of the following must the as-built drawings show? - ANSWERS✔-Details of the system
as finally installed



\.OFOI - ANSWERS✔-Owner Furnished Owner Installed (you will not need to install)



\.What does an elevation flag on a plan drawing indicate? - ANSWERS✔-Related elevation
drawings



\.What type of drawing would you use to find out exactly how the projector should be mounted
to the ceiling? - ANSWERS✔-Detail Drawing



\.Which of the following is the AV team likely to perform during new construction? -
ANSWERS✔-• Install sprinkler system

• Run cables and install mounts - Answer

• Mount drop ceiling

Written for

Institution
CTS-I
Course
CTS-I

Document information

Uploaded on
March 6, 2026
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
IszackBd University Of Washington
Follow You need to be logged in order to follow users or courses
Sold
37
Member since
1 year
Number of followers
3
Documents
5387
Last sold
1 week ago
IszackBd Stuvia

Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers. We specialize on NURSING,WGU,ACLS USMLE,TNCC,PMHNP,ATI and other major courses, Updated Exam, Study Guides and Test banks. If you don't find any document you are looking for in this store contact us and we will fetch it for you in minutes, we love impressing our clients with our quality work and we are very punctual on deadlines. Please go through the sets description appropriately before any purchase and leave a review after purchasing so as to make sure our customers are 100% satisfied. FOR ANY REQUEST FEEL FREE TO REACH US

Read more Read less
5.0

3 reviews

5
3
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions