___________ is the putting back of the excess oil that was removed from around
the building during the general excavation. It may be transported by wheelbarrows,
front end loaders, or other methods.
- answer-a. Backfilling
Concrete finishes are estimated by square feet (or square yards) of surface to be
finished. When more than one finish is required each finish must be listed
separately
- answer-True
Concrete footings can be found on wall sections and the foundation plan and are
measured in cubic yards
- answer-True
Different strengths of concrete should be taken off separately because the higher
the strength the greater the cost
- answer-True
How can reuse of concrete forms affect the estimate?
- answer-d. All items listed
How does lap affect the rebar quantities?
- answer-b. Signifies additional quantities
How may the type of bond (pattern) affect the amount of masonry material
required?
- answer-c. Requires the estimator to make a more accurate study of each size of
material required
Job-mixed concrete is concrete, which is prepared at a central plant and then
delivered to the jobsite. These plants serve more than one construction site. Plant
, ready mixed concrete requires field batching plant to be built.
- answer-False
Rebar is usually taken off in linear feet of each size bar and then converted into
weight. Most rebar is solid by hundred weight (cwt). The required lap affects the
estimate because it increases the linear feet of reinforcing bars that are required. It
is estimated by the ton
- answer-True
The estimator separates the various sizes of the masonry units in the estimate so
that the estimate will reflect the different costs and differing amounts of labor
- answer-True
The estimator would most likely find any concrete curing requirements in the
- answer-b. specifications
The layer of brick (single or double) is referred to as a
- answer-a. Wythe
The number of rows of bricks or blocks is called a
- answer-d. Course
What is the unit of measure for concrete?
- answer-a. Cubic Yard
Where would the estimator most likely find the strength of the concrete required?
- answer-c. Specifications and construction documents
Which is NOT a type of concrete finish?
- answer-c. paw pressed
Wire mesh is taken off by linear feet and converted into the weight that needs to be
ordered.
- answer-False
Wire Welded mesh is taken off by ______________ and converted into
____________
- answer-d. SF/Rolls
ANSWERS | GRADED A+ | GUARANTEED PASS!!
___________ is the putting back of the excess oil that was removed from around
the building during the general excavation. It may be transported by wheelbarrows,
front end loaders, or other methods.
- answer-a. Backfilling
Concrete finishes are estimated by square feet (or square yards) of surface to be
finished. When more than one finish is required each finish must be listed
separately
- answer-True
Concrete footings can be found on wall sections and the foundation plan and are
measured in cubic yards
- answer-True
Different strengths of concrete should be taken off separately because the higher
the strength the greater the cost
- answer-True
How can reuse of concrete forms affect the estimate?
- answer-d. All items listed
How does lap affect the rebar quantities?
- answer-b. Signifies additional quantities
How may the type of bond (pattern) affect the amount of masonry material
required?
- answer-c. Requires the estimator to make a more accurate study of each size of
material required
Job-mixed concrete is concrete, which is prepared at a central plant and then
delivered to the jobsite. These plants serve more than one construction site. Plant
, ready mixed concrete requires field batching plant to be built.
- answer-False
Rebar is usually taken off in linear feet of each size bar and then converted into
weight. Most rebar is solid by hundred weight (cwt). The required lap affects the
estimate because it increases the linear feet of reinforcing bars that are required. It
is estimated by the ton
- answer-True
The estimator separates the various sizes of the masonry units in the estimate so
that the estimate will reflect the different costs and differing amounts of labor
- answer-True
The estimator would most likely find any concrete curing requirements in the
- answer-b. specifications
The layer of brick (single or double) is referred to as a
- answer-a. Wythe
The number of rows of bricks or blocks is called a
- answer-d. Course
What is the unit of measure for concrete?
- answer-a. Cubic Yard
Where would the estimator most likely find the strength of the concrete required?
- answer-c. Specifications and construction documents
Which is NOT a type of concrete finish?
- answer-c. paw pressed
Wire mesh is taken off by linear feet and converted into the weight that needs to be
ordered.
- answer-False
Wire Welded mesh is taken off by ______________ and converted into
____________
- answer-d. SF/Rolls