Per API 653 , with of the following is The Shell to bottom joint shall be evaluated for
required when converting an existing fatigue
tank to operation at elevated
temperatures when it was not
originally designed and constructed
to API 650, Appendix M?
When removing an existing tank examined using magnetic particle inspection, and
bottom, all arc-gouged areas of the defective areas repaired and re-examined.
tank shell-to-bottom shall be:
If RBI assessment has been 14 years
conducted and the tank has cathodic
protection plus a thin-film lining, the
maximum inspection interval is:
When installing a new nozzle in a 20,000 lbf/in2
tank of unknow material, what stress
value should be used to calculate
the required shell thickness and
reinforcement?
https://quizlet.com/1152867178/api-653-recertification-quiz-exam-complete-test-questions-and-answers-verified-answers-latest-update-2026-update-fl… 1/6
, 3/7/26, 9:27 AM API 653 Recertification Quiz EXAM, Complete Test || Questions and Answers (Verified Answers) (Latest Update 2026) UPDATE!! Fla…
In regards to underside corrosion on may double with every 18 °F increase in
tank bottoms, the corrosion rate of temperature above 77 °F.
steel in a wet environment.
Grade 350W/50W is acceptable for 45mm (1.75in) if fully killed and made to a fine grain
tank plate to a maximum thickness of: practice.
If an RBI assessment has been 25 years
conducted and the tank has a
release prevention barrier, the
maximum initial inspection interval is:
As an alternative to the procedures API RP 579, section 4, 5 or 6.
in API 653 for the evaluation of any
thinning of the tank shell below
minimum required wall thickness may
be evaluated for continued service
using which code?
When welding on a tank shell 200°F
constructed of Group I steel that is
greater than 1.5 inches thick below
what minimum metal temperature ?
preheat?
When evaluated an existing The max Operating Temperature shall not exceed
temperature services tank, which has the temperature at which the tank has successfully
a successful service history of operated in the pass.
operation but was not originally
designed and constructed to the
requirement of API 650, appendix M,
which condition temperature has to
be used?
https://quizlet.com/1152867178/api-653-recertification-quiz-exam-complete-test-questions-and-answers-verified-answers-latest-update-2026-update-fl… 2/6
API 653 Recertification Quiz EXAM, Complete
Test || Questions and Answers (Verified Answers)
(Latest Update 2026) UPDATE!!
Save
Terms in this set (39)
Per API 653 , with of the following is The Shell to bottom joint shall be evaluated for
required when converting an existing fatigue
tank to operation at elevated
temperatures when it was not
originally designed and constructed
to API 650, Appendix M?
When removing an existing tank examined using magnetic particle inspection, and
bottom, all arc-gouged areas of the defective areas repaired and re-examined.
tank shell-to-bottom shall be:
If RBI assessment has been 14 years
conducted and the tank has cathodic
protection plus a thin-film lining, the
maximum inspection interval is:
When installing a new nozzle in a 20,000 lbf/in2
tank of unknow material, what stress
value should be used to calculate
the required shell thickness and
reinforcement?
https://quizlet.com/1152867178/api-653-recertification-quiz-exam-complete-test-questions-and-answers-verified-answers-latest-update-2026-update-fl… 1/6
, 3/7/26, 9:27 AM API 653 Recertification Quiz EXAM, Complete Test || Questions and Answers (Verified Answers) (Latest Update 2026) UPDATE!! Fla…
In regards to underside corrosion on may double with every 18 °F increase in
tank bottoms, the corrosion rate of temperature above 77 °F.
steel in a wet environment.
Grade 350W/50W is acceptable for 45mm (1.75in) if fully killed and made to a fine grain
tank plate to a maximum thickness of: practice.
If an RBI assessment has been 25 years
conducted and the tank has a
release prevention barrier, the
maximum initial inspection interval is:
As an alternative to the procedures API RP 579, section 4, 5 or 6.
in API 653 for the evaluation of any
thinning of the tank shell below
minimum required wall thickness may
be evaluated for continued service
using which code?
When welding on a tank shell 200°F
constructed of Group I steel that is
greater than 1.5 inches thick below
what minimum metal temperature ?
preheat?
When evaluated an existing The max Operating Temperature shall not exceed
temperature services tank, which has the temperature at which the tank has successfully
a successful service history of operated in the pass.
operation but was not originally
designed and constructed to the
requirement of API 650, appendix M,
which condition temperature has to
be used?