Contractor License Exam – Full-Length
Practice Questions And Correct Answers
(Verified Answers) Plus Rationales 2026
Q&A | Instant Download Pdf
1. What is the primary purpose of Measurement and Verification (M&V)
in energy efficiency projects?
A. To estimate construction costs
B. To confirm energy savings achieved by implemented measures
C. To design HVAC systems
D. To monitor indoor air quality
Correct Answer: B
Rationale: Measurement and Verification ensures that projected
energy savings from efficiency measures are actually realized and
documented.
2. Which organization publishes the International Performance
Measurement and Verification Protocol (IPMVP)?
, A. ASHRAE
B. EPA
C. Efficiency Valuation Organization (EVO)
D. NYC Department of Buildings
Correct Answer: C
Rationale: The IPMVP is developed and maintained by the Efficiency
Valuation Organization as a global M&V standard.
3. Which IPMVP option involves whole-facility measurement?
A. Option A
B. Option B
C. Option C
D. Option D
Correct Answer: C
Rationale: Option C uses utility meter data to assess savings at the
whole-building or facility level.
4. What is a baseline period in M&V?
A. The period after project completion
B. The time used to estimate future energy use
C. The historical period used to establish pre-project energy
performance
D. The project warranty period
Correct Answer: C
Rationale: The baseline period represents energy use before
, implementation and is used for comparison to post-project
performance.
5. Which type of meter measures electrical energy consumption?
A. Flow meter
B. Watt-hour meter
C. Pressure gauge
D. Thermocouple
Correct Answer: B
Rationale: A watt-hour meter records the amount of electrical energy
consumed over time.
6. What does M&V Option A primarily rely on?
A. Whole-building utility data
B. Simulation models
C. Engineering estimates with partial measurement
D. Continuous sub-metering
Correct Answer: C
Rationale: Option A uses some measured parameters combined with
engineering assumptions to estimate savings.
7. Which NYC code primarily governs building energy efficiency?
A. NYC Plumbing Code
B. NYC Energy Conservation Code
C. NYC Fire Code
D. NYC Zoning Resolution
, Correct Answer: B
Rationale: The NYC Energy Conservation Code establishes minimum
energy efficiency standards for buildings.
8. What is the main purpose of a commissioning process in relation to
s s s s s s s s s s s
s M&V?
A. To set energy tariffs
s s s
B. To verify systems are installed and functioning as intended
s s s s s s s s
C. To design M&V plans
s s s
D. To issue permits
s s
s Correct Answer: B
s s
Rationale: Commissioning ensures building systems perform
s s s s s
s according to design, supporting accurate M&V results.
s s s s s s
9. Which document outlines the scope, methodology, and
s s s s s s
s responsibilities for an M&V project? s s s s
A. Energy audit report s s
B. M&V Plan s
C. Construction contract s
D. Project schedule s
s Correct Answer: B
s s
Rationale: The M&V Plan defines how savings will be measured,
s s s s s s s s s
s reported, and verified. s s
10. What is normalization in energy data analysis?
s s s s s s
A. Converting energy data to cost data s s s s s