For materials not specifically covered by the code,
supporting data necessary to verify compliance with the
code must include _____.
a. a referenced standard
b. research reports
c. testing and listing
d. the manufacturer's instructions - Answer-B (P105.2)
Tests performed by _____ may be required by the code
official where there is insufficient evidence of code
compliance.
a. the owner
b. the contractor
c. an approved agency
d. a design professional - Answer-C (P105.3.2)
,2|Page
Required department records shall be retained _____.
a. permanently
b. as required by the code official
c. for as long as the building is in existence
d. as required for public record - Answer-D (P104.7)
The code official be appointed by the _____.
a. chief appointing authority
b. building official
c. director of the plumbing inspection department
d. jurisdiction attorney - Answer-A (P103.2)
The prescribed portions of the standards referenced in the
IPC and listed in Chapter 15 are considered _____.
a. requirements
b. guidelines
c. alternatives
d. modifications - Answer-A (102.8)
,3|Page
The code official shall require construction documents and
specifications to be prepared by a registered design
professional when _____.
a. the proposed construction does not comply with the
code
b. the building exceeds two stories in height
c. required by state law
d. special conditions exist - Answer-C (106.3.1)
Which of the following information ins not specifically
required on a permit application?
a. location
b. type of construction
c. the contractor
d. the owner - Answer-B (106.3)
Who is responsible for inspection scheduling?
a. the permit holder
b. the code official
c. the contractor
d. the owner - Answer-A (A107.2)
, 4|Page
A permit is not required for _____.
a. replacement of a water heater
b. rearrangement of valves or pipes
c. replacement of a concealed vent pipe
d. repairing of leaks in pipes, valves, or fixtures - Answer-
D (P106.2)
Permits expire is work is not commenced within _____
days of issuance.
a. 30
b. 60
c. 120.
d. 180 - Answer-D (P106.5.3)
An application for an appeal of the code official's decision
must be filed within _____ days after receipt of the notice.
a. 10
b. 20
c. 30
d. 60 - Answer-B (P109.1)