3/7/26, 7:23 PM ACI - Concrete Strength Technician Training EXAM, MOST TESTED QUESTIONS AND VERIFIED SOLUTIONS/GET IT 100% ACC…
ACI - Concrete Strength Technician Training
EXAM, MOST TESTED QUESTIONS AND VERIFIED
SOLUTIONS/GET IT 100% ACCURATE!! 2026!!
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Terms in this set (85)
Standard Practice for Capping ASTM C617
Cylindrical Concrete Specimens
Procedures for capping enable Perpendicularity, Planeness
concrete cylinders and cores to
meet C617's practice requirements
for___ and___.
https://quizlet.com/1152972945/aci-concrete-strength-technician-training-exam-most-tested-questions-and-verified-solutionsget-it-100-accurate-2026-… 1/11
, 3/7/26, 7:23 PM ACI - Concrete Strength Technician Training EXAM, MOST TESTED QUESTIONS AND VERIFIED SOLUTIONS/GET IT 100% ACC…
___ can be made of glass, machined Capping plates
metal, polished granite, or diabase.
(C617)
Sulfur caps can be formed against ___ Metal, stone
or___ plates.
The working surface of a capping 0.05
plate shall not depart from plane by
more than___ mm.
Device used in conjunction with a Alignment device
capping plate to ensure
perpendicularity.
Perpendicularity requirement of the 0.5
axis of a cylindrical specimen.
(degrees)
The element of a melting pot that Peripheral Heating
ensures against accidents during
reheating of cooled sulfur.
Temperature of the sulfur mortar 265-290 F
pot/materials.
Capping material to be used on Neat Portland Cement paste
freshly molded cylinders.
Remove this from the end of Oily or Waxy materials
cylinders before capping.
https://quizlet.com/1152972945/aci-concrete-strength-technician-training-exam-most-tested-questions-and-verified-solutionsget-it-100-accurate-2026-… 2/11
ACI - Concrete Strength Technician Training
EXAM, MOST TESTED QUESTIONS AND VERIFIED
SOLUTIONS/GET IT 100% ACCURATE!! 2026!!
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Terms in this set (85)
Standard Practice for Capping ASTM C617
Cylindrical Concrete Specimens
Procedures for capping enable Perpendicularity, Planeness
concrete cylinders and cores to
meet C617's practice requirements
for___ and___.
https://quizlet.com/1152972945/aci-concrete-strength-technician-training-exam-most-tested-questions-and-verified-solutionsget-it-100-accurate-2026-… 1/11
, 3/7/26, 7:23 PM ACI - Concrete Strength Technician Training EXAM, MOST TESTED QUESTIONS AND VERIFIED SOLUTIONS/GET IT 100% ACC…
___ can be made of glass, machined Capping plates
metal, polished granite, or diabase.
(C617)
Sulfur caps can be formed against ___ Metal, stone
or___ plates.
The working surface of a capping 0.05
plate shall not depart from plane by
more than___ mm.
Device used in conjunction with a Alignment device
capping plate to ensure
perpendicularity.
Perpendicularity requirement of the 0.5
axis of a cylindrical specimen.
(degrees)
The element of a melting pot that Peripheral Heating
ensures against accidents during
reheating of cooled sulfur.
Temperature of the sulfur mortar 265-290 F
pot/materials.
Capping material to be used on Neat Portland Cement paste
freshly molded cylinders.
Remove this from the end of Oily or Waxy materials
cylinders before capping.
https://quizlet.com/1152972945/aci-concrete-strength-technician-training-exam-most-tested-questions-and-verified-solutionsget-it-100-accurate-2026-… 2/11