Exam Questions and Answers
100% Pass
1. What two plans in the SWPPP must be approved?
M M M M M M M M
Answer> Erosion and sediment control plans and stormwater management
M M M M M M M M
M plans must be approved.
M M M
2. Does the stormwater management plan address runoff during construction
M M M M M M M M
M or after?
M
Answer> The stormwater management plan addresses post-construction stormwa-
M M M M M M M
ter runoff.
M M
3. What impact does impervious cover have on water quality?
M M M M M M M M
Answer> Impervious cover increases stormwater runoff volume and velocity,
M M M M M M M M
leading to higher pollutant levels like sediment and phosphorus, negatively
M M M M M M M M M M
M affecting water quality.
M M
4. What is the target pollutant in the water quality criteria?
M M M M M M M M M
, Answer> Phosphorus M
5. What is the lower limit of imperviousness that can result in stream degra-
M M M M M M M M M M M M
M dation?
Answer> 10% M
6. What destructive forces does the SWM regulation protect against?
M M M M M M M M
Answer> Channel erosion and flooding.
M M M M
7. How does the rate of runoff change after development?
M M M M M M M M
Answer> Runoff rate in- creases post-development due to vegetation replacement
M M M M M M M M M
M with impervious surfaces, potentially causing erosion and flooding.
M M M M M M M
8. What must a locality's ordinance require for submission and approval?
M M M M M M M M M
Answer> - M
ESC plan and SWM plan (9VAC25-870-148)
M M M M M
9. List three violations for which a penalty may be imposed.
M M M M M M M M M
Answer> Violations include No registration date, No SWPPP, Incomplete SWPPP,
M M M M M M M M M
M SWPPP not available for review, No approved ESC plan, Failure to install
M M M M M M M M M M M
M stormwater management BMPs or ESCs, Improperly installed or maintained
M M M M M M M M
M stormwater BMPs or ESCs, Opera- tional deficiencies, Failure to conduct required
M M M M M M M M M M
M inspections, Incomplete, improper, or missed inspections.
M M M M M
10. Maximum Penalty under the Stormwater Act M M M M M