1. Calculating HMA placement yield for what reasons - ANSWER Structural
design thickness
Adjusting cross-slope and grade
Calculate periodically and at the end of the day
2. HMA placement yield formula - ANSWER Amount used (lbs) / area
covered syds = yield
3. Do ARMI layers get tacked? - ANSWER Doesn't require tack
4. Tack must be spread - ANSWER Uniformly
Breaking of emulsion is the water evaporating from the asphalt cement
5. Traffic and Tack - ANSWER Keep traffic off tack, before it breaks and they
go over it the tack is gone and no longer uniform
6. Give the paver how far when checking the thickness a second time -
ANSWER Give paver a minimum of 32 feet before a second check to adjust
7. Thickness Probe should be set higher for what and by how much -
ANSWER set higher for roll down of 20-25%
, Target 1 inch probe set at 1 1/4 inches
Target 2 inches probe 2 1/2 inches
8. Yield VS Thickness - ANSWER Better to check yield constantly rather than
thickness
9. After you have finished coring the road you should do what to the sample
core - ANSWER Remove sample immediately to create minimal
disturbance
10.Damaged cores - ANSWER effect results
11.If the fresh asphalt is still to hot to core you should - ANSWER Cool to be
sampled with bags of ice
12.Application rate for open graded mixed - ANSWER OGFC(open graded
friction course FC-5): 0.045 gal/yd^2
13.Spread rate of tack formula - ANSWER Spread rate = gallons used at 60°F /
syds covered
14.The breaking of emulsion is - ANSWER The water evaporating from the
asphalt cement
15.Binders - ANSWER Not PG 62-22
16.Cross slope frequency - ANSWER Every 100 feet if in range then every
200 feet