PMT 0170 Risk Management ACTUAL EXAM
2026 TEST COMPREHENSIVE QUESTIONS AND
VERIFIED ANSWERS (DETAILED &
ELABORATED) 100% SOLVED 2026!!
Save
Terms in this set (26)
Which of the following is a step of -Registration
the Department of Defense (DoD) -Sourcing
Risk Management Process? -Mitigation
-Tracking
Which of the following is a critical -Researching best practices
success factor to ensure effective -Assembling the most qualified personnel for the
risk management (RM)? team
-Establishing priority risk categories
-Program Risk Process (PRP) Document
The following describes which type -Technical
of category of risk: Certification for -Business
a new weapons system is -Programmatic
scheduled for January. To conduct a
meaningful test, temperatures must
be below freezing. If the
temperature is too warm, the test
cannot be conducted.
, Which of the following are the -Probability, cost, future root cause
components of opportunity -Likelihood, level, consequence
management (OM)? -Level, priority, benefit
-Future root cause, probability, benefit
Within a program, which of the -Risk Owner
following entities is responsible for -Risk Working Group
ensuring the risk management (RM) -Risk Management Board (RMB)
process is executed according to -Program Executive Officer (PEO)
the Program Risk Process (PRP)
Document?
During the Materiel Solution -Alternative System Review (ASR)
Analysis (MSA) phase, it is -System Functional Review (SFR)
important to assess risks to achieve -Preliminary Design Review (PDR)
exit criteria for which review? -System Requirements Review (SRR)
Monte Carlo simulations use -Because the results show the average length of
computational algorithms to the tasks needed to complete the program for
simulate the behavior of various the PM to use when building the schedule
systems in a nondeterministic -Because the results show a clear path to project
manner. Why are these completion for the program manager (PM) to
"nondeterministic" results important follow
to program schedule analysis? -Because it means there is no way to tell which
way is the correct way to run the program
-Because there are one or more points in the
simulation where a choice is made between
different paths, without any specific guidance
on which one will be chosen
2026 TEST COMPREHENSIVE QUESTIONS AND
VERIFIED ANSWERS (DETAILED &
ELABORATED) 100% SOLVED 2026!!
Save
Terms in this set (26)
Which of the following is a step of -Registration
the Department of Defense (DoD) -Sourcing
Risk Management Process? -Mitigation
-Tracking
Which of the following is a critical -Researching best practices
success factor to ensure effective -Assembling the most qualified personnel for the
risk management (RM)? team
-Establishing priority risk categories
-Program Risk Process (PRP) Document
The following describes which type -Technical
of category of risk: Certification for -Business
a new weapons system is -Programmatic
scheduled for January. To conduct a
meaningful test, temperatures must
be below freezing. If the
temperature is too warm, the test
cannot be conducted.
, Which of the following are the -Probability, cost, future root cause
components of opportunity -Likelihood, level, consequence
management (OM)? -Level, priority, benefit
-Future root cause, probability, benefit
Within a program, which of the -Risk Owner
following entities is responsible for -Risk Working Group
ensuring the risk management (RM) -Risk Management Board (RMB)
process is executed according to -Program Executive Officer (PEO)
the Program Risk Process (PRP)
Document?
During the Materiel Solution -Alternative System Review (ASR)
Analysis (MSA) phase, it is -System Functional Review (SFR)
important to assess risks to achieve -Preliminary Design Review (PDR)
exit criteria for which review? -System Requirements Review (SRR)
Monte Carlo simulations use -Because the results show the average length of
computational algorithms to the tasks needed to complete the program for
simulate the behavior of various the PM to use when building the schedule
systems in a nondeterministic -Because the results show a clear path to project
manner. Why are these completion for the program manager (PM) to
"nondeterministic" results important follow
to program schedule analysis? -Because it means there is no way to tell which
way is the correct way to run the program
-Because there are one or more points in the
simulation where a choice is made between
different paths, without any specific guidance
on which one will be chosen