CPO WAKE COUNTY EXAM WITH CORRECT VERIFIED
ANSWERS ((LATEST VERSION)
Section 2:
Year Round Pool - ANSWER ->any pool that is indoor and
heated
Section 3:
No person shall , , , or a
pool unless the plans and specs. have been submitted
and approved in writing by the director.
-Application for such approval must be on forms
provided by the . - ANSWER ->construct, install,
extend, or modify
the director
Section 3: Approval of Plans and Pool Construction
-The applicant shall include all the following info. at the
time the application is submitted to the dept. of enviro.
science:
*plans shall be to engineer's or architectural scale.* -
ANSWER ->-site plan including:
,pool, deck, and any other appurtenant buildings
-plan and sectional view dimensions of both:
the pool, and the area enclosed by the barrier fence
-plans and layout for:
the bathhouse, the the equipment room, and the
chemical storage room
-Manufacturer's spec. of all treatment equip. used and
their layout in the equip. room
-a piping schematic showing:
piping, piping size, inlets, main drains, skimmers, gutter
outlets, vacuum fittings, and all other appurtenances
connected to the pool piping sytem
-specifications for water supply and wastewater disposal
systems including:
well location, sewage disposal system location, and
backwash water disposal where applicable
-a fencing disposal
-a lighting schedule, if pool is open for night swimming
Section 3: Approval of plans and pool construction
,The director shall approve the plans and specifications
only if they . - ANSWER ->comply with the
standards of:
const. , design, and equip. as required by these regs. and
the NC governing public swimming pools, 15A NCAC 18A
.2500
Section 3: Approval of plans and pool construction
The swimming pool shall be const. in accordance w/the
plans approved by the director and shall be subject to all
cond. and/or revisions noted as part of the .
Inspections at the construction site may be made as is
necessary to assure that the const. is according to
approved plans. Any mods. to approved plans must be
submitted and approved .
When the construction of the pool is complete and the
pool is ready for the Wake County Swimming Pool
Operations Permit, the owner or rep. shall .-
ANSWER ->written approval
prior to construction
request an inspection by the director
, Section 4: Design Details
Any type of water device or feature, which sprays or
discharges water onto the surface of a swimming pool
where the depth exceeds , is prohibited.
This does not include: - ANSWER ->18 inches
-wading pools designed to have water recreational
attractions
-areas in a pool under a water slide
-fill spouts, or
-competition diving pools where water is discharged on
the surface for a diver's ref. point
Section 5: Permits to Operate
A Wake County Swimming Pool Operations Permit shall
be required for:
A WCPOP shall be issued when:
A WCPOP is valid for no more than months and
shall be subject for to insure compliance with
these regulations. - ANSWER ->the operation of a pool in
Wake County
an investigation by the director indicates the facilities are
in compliance w/ these regulations.
ANSWERS ((LATEST VERSION)
Section 2:
Year Round Pool - ANSWER ->any pool that is indoor and
heated
Section 3:
No person shall , , , or a
pool unless the plans and specs. have been submitted
and approved in writing by the director.
-Application for such approval must be on forms
provided by the . - ANSWER ->construct, install,
extend, or modify
the director
Section 3: Approval of Plans and Pool Construction
-The applicant shall include all the following info. at the
time the application is submitted to the dept. of enviro.
science:
*plans shall be to engineer's or architectural scale.* -
ANSWER ->-site plan including:
,pool, deck, and any other appurtenant buildings
-plan and sectional view dimensions of both:
the pool, and the area enclosed by the barrier fence
-plans and layout for:
the bathhouse, the the equipment room, and the
chemical storage room
-Manufacturer's spec. of all treatment equip. used and
their layout in the equip. room
-a piping schematic showing:
piping, piping size, inlets, main drains, skimmers, gutter
outlets, vacuum fittings, and all other appurtenances
connected to the pool piping sytem
-specifications for water supply and wastewater disposal
systems including:
well location, sewage disposal system location, and
backwash water disposal where applicable
-a fencing disposal
-a lighting schedule, if pool is open for night swimming
Section 3: Approval of plans and pool construction
,The director shall approve the plans and specifications
only if they . - ANSWER ->comply with the
standards of:
const. , design, and equip. as required by these regs. and
the NC governing public swimming pools, 15A NCAC 18A
.2500
Section 3: Approval of plans and pool construction
The swimming pool shall be const. in accordance w/the
plans approved by the director and shall be subject to all
cond. and/or revisions noted as part of the .
Inspections at the construction site may be made as is
necessary to assure that the const. is according to
approved plans. Any mods. to approved plans must be
submitted and approved .
When the construction of the pool is complete and the
pool is ready for the Wake County Swimming Pool
Operations Permit, the owner or rep. shall .-
ANSWER ->written approval
prior to construction
request an inspection by the director
, Section 4: Design Details
Any type of water device or feature, which sprays or
discharges water onto the surface of a swimming pool
where the depth exceeds , is prohibited.
This does not include: - ANSWER ->18 inches
-wading pools designed to have water recreational
attractions
-areas in a pool under a water slide
-fill spouts, or
-competition diving pools where water is discharged on
the surface for a diver's ref. point
Section 5: Permits to Operate
A Wake County Swimming Pool Operations Permit shall
be required for:
A WCPOP shall be issued when:
A WCPOP is valid for no more than months and
shall be subject for to insure compliance with
these regulations. - ANSWER ->the operation of a pool in
Wake County
an investigation by the director indicates the facilities are
in compliance w/ these regulations.