Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CPO WAKE COUNTY EXAM WITH COMPLETE SOLUTIONS

Rating
-
Sold
-
Pages
33
Grade
A+
Uploaded on
08-03-2026
Written in
2025/2026

CPO WAKE COUNTY EXAM WITH COMPLETE SOLUTIONS

Institution
CPO - Certified Professional Organizer
Course
CPO - Certified Professional Organizer

Content preview

CPO WAKE COUNTY EXAM WITH CORRECT VERIFIED
ANSWERS ((LATEST VERSION)


Section 2:
Year Round Pool - ANSWER ->any pool that is indoor and
heated

Section 3:
No person shall , , , or a
pool unless the plans and specs. have been submitted
and approved in writing by the director.
-Application for such approval must be on forms
provided by the . - ANSWER ->construct, install,
extend, or modify

the director

Section 3: Approval of Plans and Pool Construction
-The applicant shall include all the following info. at the
time the application is submitted to the dept. of enviro.
science:
*plans shall be to engineer's or architectural scale.* -
ANSWER ->-site plan including:

,pool, deck, and any other appurtenant buildings

-plan and sectional view dimensions of both:
the pool, and the area enclosed by the barrier fence

-plans and layout for:
the bathhouse, the the equipment room, and the
chemical storage room

-Manufacturer's spec. of all treatment equip. used and
their layout in the equip. room

-a piping schematic showing:
piping, piping size, inlets, main drains, skimmers, gutter
outlets, vacuum fittings, and all other appurtenances
connected to the pool piping sytem

-specifications for water supply and wastewater disposal
systems including:
well location, sewage disposal system location, and
backwash water disposal where applicable

-a fencing disposal
-a lighting schedule, if pool is open for night swimming

Section 3: Approval of plans and pool construction

,The director shall approve the plans and specifications
only if they . - ANSWER ->comply with the
standards of:
const. , design, and equip. as required by these regs. and
the NC governing public swimming pools, 15A NCAC 18A
.2500

Section 3: Approval of plans and pool construction
The swimming pool shall be const. in accordance w/the
plans approved by the director and shall be subject to all
cond. and/or revisions noted as part of the .

Inspections at the construction site may be made as is
necessary to assure that the const. is according to
approved plans. Any mods. to approved plans must be
submitted and approved .

When the construction of the pool is complete and the
pool is ready for the Wake County Swimming Pool
Operations Permit, the owner or rep. shall .-
ANSWER ->written approval

prior to construction

request an inspection by the director

, Section 4: Design Details
Any type of water device or feature, which sprays or
discharges water onto the surface of a swimming pool
where the depth exceeds , is prohibited.
This does not include: - ANSWER ->18 inches

-wading pools designed to have water recreational
attractions
-areas in a pool under a water slide
-fill spouts, or
-competition diving pools where water is discharged on
the surface for a diver's ref. point

Section 5: Permits to Operate
A Wake County Swimming Pool Operations Permit shall
be required for:

A WCPOP shall be issued when:

A WCPOP is valid for no more than months and
shall be subject for to insure compliance with
these regulations. - ANSWER ->the operation of a pool in
Wake County

an investigation by the director indicates the facilities are
in compliance w/ these regulations.

Written for

Institution
CPO - Certified Professional Organizer
Course
CPO - Certified Professional Organizer

Document information

Uploaded on
March 8, 2026
Number of pages
33
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
LeeErickson
1.5
(2)

Get to know the seller

Seller avatar
LeeErickson Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
11
Member since
1 year
Number of followers
1
Documents
3289
Last sold
3 days ago

1.5

2 reviews

5
0
4
0
3
0
2
1
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions