Honorarium - correct answer A stated amount sometimes paid to unsuccessful
proposers in consideration of preparing a Design-Build Proposal.
Spearin Doctrine - correct answer The owner warrants the sufficiency of the plans
and specs to the contractor under this regulation.
Shortlisting - correct answer The process of narrowing the field of DB teams
through the selection of the most qualified proposers on the basis of qualifications.
Design-Construct Interface - correct answer When you align design delivery with
the construction schedule.
,"No-Go" Example - correct answer The owner has plans that are too developed and
the DB'er must provide a price.
"No-Go" Example - correct answer All firms that prequalify in the RFQ process are
eligible to compete for the Best Value procurement in the RFP process.
Technical Proposal - correct answer The portion of the DB proposal that contains
the non-price components such as design, proposed schedule, overall management
approach, and quality assurance plan.
Performance Requirement - correct answer A requirement the expressed the
owner's needs and expected operation of the end product.
, Certificate of Errors and Omissions Insurance - correct answer NOT included in the
basis of design documents.
Basis of Design Documents - correct answer Owner's Project Criteria (RFP),
Deviation List, Design-Builder's Proposal.
Contingency - correct answer Amount of dollars added to an estimate to cover risks
associated with the unknown.
Design-Build Cost Model - correct answer A tool used to develop and manage the
design.
BAFO - correct answer Best And Final Offer