ACI Concrete Field Testing Technician- Grade I
Version 1 Actual Verified Exam Newest With Complete
Questions And Correct Detailed Answers|| Newest
Exam!!!
After the temperature of the concrete is read, what is
required? - Answer-Reporting of temperature
The temperature of concrete is reported to the nearest
_____ degrees F [_____ C] - Answer-1 degree F [0.5 C]
According to ASTM C1064, what is one reason to take the
temperature of concrete? - Answer-Verify conformance to
a specified requirement for temperature of concrete
A maximum temperature of freshly mixed concrete is
specified in ASTM C1064. True of False? - Answer-False
The sample of concrete used for temperature
determination must be rodded 25 times. True or False? -
Answer-False
,2|Page
Sampling by this method is required when tests are to be
made to determine _____ with specification requirements.
- Answer-Compliance
This method covers sampling from four types of mixtures
which are _____, _____, _____, and _____. - Answer-
Stationary mixers, paving mixers, revolving drum mixers,
and open top mixers
The maximum allowable time between obtaining the first
and final portions of a composite sample is _____
minutes. - Answer-15
Portions of a composite sample shall be thoroughly
remixed bfore beginning tests on the sample. True of
False? - Answer-True
The maximum elapsed time allowed between obtaining
the final portion of the composite sample and beginning
the tests for slump, temperature, and air content is _____
minutes. - Answer-5
, 3|Page
The molding of strength test specimens shall begin within
_____ minutes after fabricating the composite sample. -
Answer-15
The concrete sample must be protected from
contamination and _____. - Answer-Rapid evaporation
The minimum size sample for making strength test
specimens is _____. - Answer-28 L (1ft^3)
When sampling from a stationary mixer, the batch must be
sampled at _____ or more regularly spaced intervals
during discharge of the middle portion of the batch -
Answer-2
The sensor of the temperature measuring device shall be
submerged a minimum of _____ in. [_____mm] into the
freshly mixed concrete. - Answer-3 in. [75 mm]
The temperature measuring device shall have a capacity
of measuring temperature of freshly mixed concrete to +-
_____ degrees F [+- _____ C] throughout a range of
_____. - Answer-1 degree F [0.5 C], 30 degrees F to 120
F [0 C to 50 C]