OT&E, TEMP, WIPT, Live Fire Testing, Operational Effectiveness,
Operational Suitability, Verification, Validation, VV&A, Integrated
Master Plan, IMS, Work Breakdown Structure, Functional/Product
WBS, Critical Path, Milestones, Risk Management, Technical
Performance Measurement, TMRR, Integrated Testing,
Concurrent/Combined DT-OT, Interoperability, JITC Certification,
Manufacturing Integration, Lean/Producibility, Agile Scheduling,
Quality Function Deployment, PHS&T, Data Rights, Rapid Acquisition
Process Exam Questions Verified and Provided with Complete A+
Graded Rationales Latest Updated 2026
Understand the purpose of T&E and why we test.
· Provide essential information to decision-makers
· Assess attainment of technical performance parameters
· Determine whether systems are operationally effective, suitable, survivable and safe for
intended use
Recognize the customers of T&E.
Acquisition Managers
Designers and Engineers
End-Users of the System
Logisticians
,Recognize the various test agencies.
Army Test and Evaluation Command (ATEC)
Navy Operational Test and Evaluation Force (OPTEVFOR)
Air Force Operational Test and Evaluation Center (AFOTEC)
Marine Corps Operational Test and Evaluation Activity (MCOTEA)
DT&E - Generic term encompassing Modeling and Simulation (M&S) and Engineering type
testing
Research Effort/Test
Technical Feasibility Test (TFT)
Engineering Development Test (EDT)
Production Qualification Test (PQT)
Production Verification Test (PVT)
First Article Test (FAT)
Production Acceptance Test & Evaluation (PAT&E)
Live Fire Testing (LFT)
Logistics Demonstration (LD)
OT&E Estimates system Operational Effectiveness (OE) and Operational Suitability (OS)
· Early Operational Assessment (EOA)
· Operational Assessment (OA)
· Initial Operational Test and Evaluation (IOT&E)
· Follow-on Operational Test and Evaluation (FOT&E)
, Define Operational Effectiveness and Operational Suitability.
OE = How well it does the job?
OS = How well it can be supported?
Define Test and Evaluation
Testing: Program, procedure or process to obtain, verify, or provide data to determine the
degree to which a system or systems meet, exceed or fail to meet stated capabilities. Obtains
raw data Measures specific, individual performance factors Is resource intensive
Evaluation: Independent process to review, analysis, and assessment of data obtained from
testing used to project system performance under operational conditions. Produces analyzed
information from test data, modeling and simulation, or other sources Draws conclusions by
looking at how the factors interact Is intellectually intensive
Understand the purpose of Live Fire Testing and when it applies.
Determines crew survivability and/or system vulnerability
Confirms lethality of munitions/missiles against intended target set
Mandated by FY87 Defense Authorization Bill
· Applies to all:
· ACAT I and II major vehicles and weapons platforms
· Conventional weapons that provide some degree of protection
· Major munitions greater than 1M rounds
Define Interoperability and JITC's role