Which agency approves a site-specific variance which allows
for an alternative
method of construction or
monitoring:
a.) The Regional Water Quality Board
b.) The State Water Resources Control Board
c.) The Department of Toxic Substance Control
d.) The local agency - ANSWER -a.) The Regional Water Quality
Board
CCR Title 23, Sec 2681(a)
A permit to operate a UST system must have all of the
following listed on the
permit,
EXCEPT:
a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank capacity
,c.) Permit expiration date
d.) Monitoring requirements - ANSWER -b.) Name of the tank
manufacturer and tank capacity
CCR Title 23, Sec 2712(c)
All underground pressurized product piping shall have an
automatic line leak
detector capable of detecting a 3-gallon per hour leak
rate installed
by______________.
a.) July 1,
2003
b.) November 9,
2004
c.) July 1,
2004
d.) July 1, 1987 - ANSWER -b.) November
9, 2004
CCR Title 23, Sec 2636(f)(3)
A temporary closure is appropriate for which of the following:
a.) The UST system is empty and will be removed from service
indefinitely
b.) The UST system has ceased to store hazardous materials
but will be used within the next 12 consecutive months
,c.) The UST system is unable to meet compliance requirements
and will be removed
d.) The UST system has been red-tagged - ANSWER -b.) The
UST system has ceased to store hazardous materials but will
be used within the next 12 consecutive months
CCR Title 23, Sec 2671 & 2670
A local agency determines that a UST facility within the last
year had compliance issues. Prior to issuing a new permit or
renewal to operate an UST the local agency shall:
a.) Ask the state to assist in a joint inspection
b.) Request the owner/operator to submit a "Return to
Compliance" form.
c.) Refer to a District Attorney Investigator
d.) Inspect the facility and determine compliance - ANSWER -d.)
Inspect the facility and determine compliance
CCR Title 23, Sec 2712(c)
Spill containers must be tested no less than _______________
to demonstrate
that it is capable of containing the hazardous substances until
it is detected and
cleaned
up.
a.) Every 6 months
, b.) Every 36 months
c.) Every 12 months
d.) At the time of install or replacement - ANSWER -c.) Every 12
months
H&SC, Sec 25284.2
All the following components require third party certification,
except:
a.) Automatic tank gauging
systems
b.) Statistical inventory
reconciliation methods
c.) Spill
Containment lids
d.) Liquid phase out-of-tank products - ANSWER -c.) Spill
Containment lids
The exterior surface of an underground storage tank must
bear a marking or
label which shows the following
information, except:
a.) Design pressure in psig
b.) Useable capacity in gallons.
c.) Width of the interstitial space
d.) Identity of manufacturer - ANSWER -c.) Width of the
interstitial space