EPA Lead Inspector Questions and
Correct Answers/ Latest Update /
Already Graded
Lead-based paint (LBP) M M
Ans: Any varnish, shallac, or coating that contains either- 1.0 mg/cm2 -
M M M M M M M M M M M
0.5 % by weight - 5000 ppm - Older instruments could not read accurately at
M M M M M M M M M M M M M M
0.7, so the lead standard was updated to 1.0
M M M M M M M M M
Dust sample clearance values
M M M
Ans: - Floors: 40 μg/ft2 > 10 μg/ft2 (10 μg/ft2 in NY) - Windows: 250 μg/ft2
M M M M M M M M M M M M M M M
> 100 μg/ft2 (50 μg/ft2 in NY) - Window wells (troughs): 400 μg/ft2 (100 μg/ft2
M M M M M M M M M M M M M M
in NY) - Samples must be at 1 sq ft > 2 sq ft (can be reduced to 1 sq ft if within 10
M M M M M M M M M M M M M M M M M M M M M M M M
μg)
M
EPA Soil Regulations
M M
,2|Page
Ans: - 400 ppm for playgrounds/children's areas - 1200 ppm for rest of yard -
M M M M M M M M M M M M M M
M There must be 9 sq ft of soil to classify with soil testing - At 5000 ppm, MUST
M M M M M M M M M M M M M M M M M
remediate/abate (remove & replace, paving, or bioremediation)
M M M M M M M
Lab sampling technique
M M
Ans: - AAS (Atomic Absorption Spectrometry) - Sample is placed into a
M M M M M M M M M M M
M furnace and vaporized ... light is shone through to give a quantitative result
M M M M M M M M M M M M
XRF
Ans: - X-ray fluorescence - Utilizes radioactive isotopes (unstable material
M M M M M M M M M
M trying to reach stability) - Cobalt-57 (half-life of 9 months) and cadmium-
M M M M M M M M M M M
M 109 (half-life of 15 months) are the two sources (where radiation originates) -
M M M M M M M M M M M M
M Emits gamma rays but will read X-rays (backscatters) - Ionizing radiation from
M M M M M M M M M M M
the removal of electrons due to interactions with radiation
M M M M M M M M M
LBP Hazard
M
, 3|Page
Ans: ANY condition that causes exposure to lead
M M M M M M M
LBP inspection
M
Ans: a surface-by-surface investigation to determine the presence of
M M M M M M M M
M lead
CPSC
Ans: - Consumer Product Safety Commission - Set a lead paint standard:
M M M M M M M M M M M
M cannot contain 0.06% lead by weight ... updated to 0.009% - The
M M M M M M M M M M M
M commission banned lead-based paint in 1978
M M M M M
True/False: Dust sampling only done for hazard assessments
M M M M M M M
Ans: True; only risk assessors take samples to determine likelihood of
M M M M M M M M M M
M coming into contact with contaminants
M M M M
What kind of sampling must be done for inspections?
M M M M M M M M