The footing or anchorage for scaffolds must be capable of carrying the
M M M M M M M M M M M
maximum intended load without: - correct-answer-Tying or guying
M M M M M M M M
Erectors of a scaffold who exposed to potential falling object hazards
M M M M M M M M M M
shall be provided with: - correct-answer-Over head protection
M M M M M M M M
Osha requires a rest landing at intervals not exceed: - correct-answer-
M M M M M M M M M M
35 feet
M
, P age |2
What body produces the primary Code or regulations guiding the
M M M M M M M M M
scaffolding industry? - correct-answer-OSHA (Occupational Safety and
M M M M M M M
Healthy Agency)
M M
What should be used to erect scaffolding on uneven ground? - correct-
M M M M M M M M M M M
answer-Leveling Jacks
M M
OSAH specifically prohibits the use of? - correct-answer-Lean to
M M M M M M M M
scaffolds
M
Boards or wooden pad placed on the soil to support scaffold legs are? -
M M M M M M M M M M M M M
correct-answer-Mudsills
The tube of a tube and clamp scaffold is normally what size O.D.? -
M M M M M M M M M M M M M
correct-answer-1.9 Inches M
, P age |3
Scaffold decks that overlap a minimum of how many inches, unless
M M M M M M M M M M
secured in some other way? - correct-answer-12
M M M M M M M
the bearer in a tube and clamp scaffold is always? - correct-answer-
M M M M M M M M M M M
Placed above the adjacent runner.
M M M M
What must a rolling scaffold have on each caster or roller? - correct-
M M M M M M M M M M M M
answer-Positive locking device
M M M
Who must inspect a scaffold each work shift and after any occurrence
M M M M M M M M M M M
which could effect a scaffold's structural integrity? - correct-answer-
M M M M M M M M M
Competent person
M M
What is the minimum tensile strength of D-rings and snap hooks on a
M M M M M M M M M M M M
safety harness? - correct-answer-5,000 pounds