Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

NICET HIGHWAY CONSTRUCTION INSPECTOR LEVEL III NEWEST EXAM 2026

Rating
-
Sold
-
Pages
25
Grade
A+
Uploaded on
11-03-2026
Written in
2025/2026

Which phrase is true of test reports required for concrete sidewalks, asphalt pavement, concrete curb, and pipe culverts for rest areas? a) 50% required on roadway contracts b) required for federal-aid projects only c) same as roadway contracts d) submitted in duplicate - answer-? According to FP-14, when removing existing concrete structure in the roadbed, how many inches below the subgrade elevation should the existing structure be removed to? a) 12 inches b) 24 inches c) 30 inches d) 36 inches - answer-d) 36 inches What does a white disk on the fire hydrant represent? a) fire hydrant out of service b) low pressure hydrant c) wrong fire hydrant is in service d) wrong high pressure hydrant - answer-a) fire hydrant out of service

Show more Read less
Institution
NICET HIGHWAY CONSTRUCTION INSPECTOR LEVEL III
Course
NICET HIGHWAY CONSTRUCTION INSPECTOR LEVEL III

Content preview

NICET HIGHWAY CONSTRUCTION INSPECTOR
LEVEL III NEWEST EXAM 2026


Which phrase is true of test reports required for
concrete sidewalks, asphalt pavement, concrete
curb, and pipe culverts for rest areas?

a) 50% required on roadway contracts
b) required for federal-aid projects only
c) same as roadway contracts
d) submitted in duplicate - answer-?

According to FP-14, when removing existing
concrete structure in the roadbed, how many inches
below the subgrade elevation should the existing
structure be removed to?

a) 12 inches
b) 24 inches
c) 30 inches
d) 36 inches - answer-d) 36 inches

What does a white disk on the fire hydrant
represent?

,a) fire hydrant out of service
b) low pressure hydrant
c) wrong fire hydrant is in service
d) wrong high pressure hydrant - answer-a) fire
hydrant out of service

During installation of traffic loops in the pavement,
which three statements apply prior to and during
the installation of loop wire? (Choose 3).

a) Do not allow vehicular traffic over an open saw
cut.
b) Do not overlap saw cuts at the corner.
c) Thoroughly clean the saw cut of foreign material.
d) Use a plastic sleeve where loop wire crosses a
joint. - answer-a) Do not allow vehicular traffic over
an open saw cut.
c) Thoroughly clean the saw cut of foreign material.
d) Use a plastic sleeve where loop wire crosses a
joint.

The contractor is installing a culvert with a 12-inch
reinforced concrete pipe ( outside diameter of 16.50
inches) from Sta 10+00, 40 feet Left to STA 10+00, 65
feet Right on 4-inch bedding material. The 12-inch

, RCP outlet is to be installed at Sta 10+00, 40 feet
Left at an invert elevation of 652.50.

If the conduit is installed at a 1.40% slope, what is
the elevation of the foundation grade at Sta 10+00,
45 feet Right?

a) 652.04
b) 653.17
c) 653.36
d) 653.50 - answer-?

On the reservoir side of a dam, erosion protection
against wave action should extend up the slope to
at least which level?

a) crest of dam
b) maximum water elevation
c) minimum water elevation
d) two-thirds the height of the dam - answer-b)
maximum water elevation

During stage construction while installing drainage,
the contractor must complete which two of the
following tasks? (Choose two).

Written for

Institution
NICET HIGHWAY CONSTRUCTION INSPECTOR LEVEL III
Course
NICET HIGHWAY CONSTRUCTION INSPECTOR LEVEL III

Document information

Uploaded on
March 11, 2026
Number of pages
25
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$21.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
gicharumichael281
5.0
(2)

Get to know the seller

Seller avatar
gicharumichael281 Columbia University
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
2 year
Number of followers
1
Documents
213
Last sold
3 months ago

5.0

2 reviews

5
2
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions