Curve Optimization Resource Management Resource Leveling Technological
Innovation Karl Benz Wilbur and Orville Wright Jack Kilby and Robert Noyce
Robert E. Kahn and Vince Cerf Synergistic Relationship Human Genome Project
Biotechnology Bernoulli's Principle Aerodynamics Thrust Lift Drag Biological
Engineering Molecular Biology Pathology Petrochemicals Agrochemicals
Polymers Inorganic Industrial Compounds Organic Industrial Compounds
Oleochemicals Elastomers Ergonomics Scale Model Prototype Engineering
Drawing Flowcharts Scope of the Project Quality Control Assurance Plan Gantt
Chart Workflow Sectional View Pictorial Representation Assembly Drawing
Working Drawing Presentation Drawing 1/48 Scale Perspective Balance
Symmetrical Balance Asymmetrical Balance Radial Balance Proportion Harmony
Elements of Design Geometric Form Organic Forms/Shaes Split-Complementary
Colors Color Scheme Hard Light Artificial Light Front Light Backlight Soft Light ISO
Aperture Shutter Speed Focal Length Exam Questions Verified and Provided with
Complete A+ Graded Rationales Latest Updated 2026
diffusion
when a new innovation comes about and it must be spread to other people and groups in order
to be effective.
Diffusion Curve
a visualization of diffusion of innovation as a bell curve showing the progressive participation of
consumers, beginning with innovators and early adopters, proceeding to majority adoption, and
concluding with laggards
,Optimization
The act or process of making a design as fully perfect, functional, or effective as possible based
on client feedback
resource management
using resources without depleting them
Resource Leveling
A resource optimization technique in which adjustments are made to the project schedule to
optimize the allocation of resources and which may affect critical path.
technological innovation
the discovery and development of new or improved products, services, or processes for
producing or providing them
Karl Benz
widely regarded as the inventor of the gasoline-powered car, placed the first automobiles into
production during 1885.
Wilbur and Orville Wright
developed the airplane in 1903
,Jack Kilby and Robert Noyce
developed the integrated circuit in 1958
Robert E. Kahn and Vince Cerf
Developed the first TCP/IP protocol than ended up leading to the internet.
Synergistic Relationship
Human Genome Project
seeks to discover all human genes and create a reference sequence for the human genome.
Biotechnology
uses living organisms and bioprocesses to create products or processes.
Bernoulli's Principle
As the speed of a fluid increases, its pressure decreases.
Aerodynamics
, The study of forces and the resulting motion of objects through the air.
thrust
the pushing or pulling force exerted by the engine of an aircraft or rocket
lift
an upward force
drag
resistance by friction from air or water moving over a surface
biological engineering
The branch of engineering that deals with applications of biological processes to the
manufacture of products.
molecular biology
the study of heredity at the molecular level
Pathology
uses laboratory equipment to diagnose disease.