NEIEP 200 Final Exam Questions with Complete Solutions | Latest Update 2026 | Graded A+
NEIEP 200 Final Exam Questions with Complete Solutions | Latest Update 2026 | Graded A+ you are about to loosen a fishplate bolt. which wrench would be least likely to slip? - answer-a. 6 point box end wrench b. 12 point box end wrench c. open end wrench you are using a plumb line to check a rail for plumb. you find that at the top it measures 1" and at the bottom it measures 1 1/4". what does this tell you? - answer-a. the top of the rail needs to go towards the center b. the top of the rail needs to go toward the wall c. the bottom of the rail needs to go toward the wall you are plumbing rails on a high rise installation. what type of plumb line should you use? - answer-a. nylon string b. monofilament wire c. piano wire you need to cut into a concrete wall. which tool should you use? - answer-disc grinder with a diamond blade disc you need to select a heavy duty drill for drilling 5/8" holes in a machine beam. what factor determines the drill rating? - answer-chuck sizeyou are tasked with setting 3/4" concrete anchors. which type of drill should you use? - answerrotary hammer you need to cut and 8ft section of 1/2" EMT conduit pipe. what would be the best tool for the job? - answer-hacksaw with 24 teeth per inch you are directed to move oxy-acetylene cylinders from a storage area to a work site. what is the proper way to transport them? - answer-in an upright position you are setting up welding equipment. what is the maximum psi that the regulator for the acetylene gas may be adjusted to? - answer-10-12 psi you are using rollers to move a heavy elevator machine and are approaching a corner. which technique should you use to maneuver around it? - answer-angle front roller gradually and continue around the corner you are preparing to unload a truck at the loading dock and the truck is 8" higher than the dock. what do you do? - answer-use a steel plate to span the gap you just finished the surface inspection of a manila rope you will be using for hoisting. what method should you use to conduct an internal inspection? - answer-slightly untwist the strands you are preparing to hoist rails and are inspecting your manila rope. which of the following is a good characteristic of manila rope? - answer-a light yellow color with a silvery or pearly luster a mechanic attaches a chainfall to a hoisting beam with a beam clamp. what happens to the capacity of the hoisting beam? - answer-it is reduced to 50% of original capacityyou are rigging elevator equipment with a sling angle of 60 degrees. you are using a shouldered eye bolt with a tapped 1/2" diameter hole. once the shoulder is seated, what is the minimum thread depth required? - answer-at least 3/4" you will be hoisting 1klbs with a single leg vertical hitch. what will the sling load be when the load is in the air - answer-1k lbs you must attach a wire rope to a load by creating a loop with 3 u-bolt wire rope clips. how should the clips be attached? - answer-no nuts on a dead horse you are using a bowline knot- what is one disadvantage of this knot - answer-is can easily loosen when not loaded you are preparing to lift a load and need to tie the ends of two ropes together. which knot should you use? - answer-square the rated load tag on a sling is 2000lbs. what does this mean? - answer-load limit that can be picked and held you need to lift rails to the top floor of a building. with a well wheel at the top of the hoistway, what type of rope should you use? - answer-synthetic a crane is needed to hoist controllers on to the roof. who is responsible for making the lift plan? - answer-lift director during elevator install you need to rig equipment to the top of the building. what info must be included in the lift plan? - answer-capacity of rigging materialthe crane operator is awaiting you signals to lift a pallet of parts. what are the correct audible signals to raise the load 20 feet? - answer-hoist, hoist up, 20,15,10,1, hoist stop you are storing fiber core wire rope slings. what could cause damage to the core material? - answer-solvents you are selecting a wire rope sling to rig 1000lbs. what safety factor does asme require? - answer-5:1 there could be unapparent wear in the slings you must use for hoisting. what sling rating take this into account? - answer-rated load where is the best place to store natural fiber hoisting rope - answer-open sided crate you have installed a power winch at the first floor preparing to hoist equipment. the hoist rope passes over a single sheave on the hoist beam making a direct pick. what is the downward force that a 3000lb load will exert on the overhead hoist beam? - answer-6k lbs you are preparing to use a chainfall to lift a load up a hoistway. what safety equipment is required on each of the two hooks on the chain fall? - answer-tags who can give the command to stop a hoist? - answer-anyone which safety feature protects against getting caught under a counterweight? - answercounterweight guard you are installing a 250 fpm freight elevator. what type of buffers should you use? - answer-oil buffersyou are working in a pit deeper than normal. what can you do to bring the buffers up to the proper height? - answer-buffer stands what document will tell you if you need buffer channels? - answer-final layout when installing a reduced stroke buffer, what additional component is required? - answer-speed limiting device you just attached a governor tension sheave to a rail. what must be done to finalize its position? - answer-check for plumb and tighten all bolts. you are installing pit equip for a high rise elevator. which of the following is required for an 800 fpm car? - answer-compensating sheave tie down you have installed the comp rope sheave. what must you do to prepare for comp rope install? - answer-block the comp sheave above normal position you are about to perform maintenance on pit equip. what is required for oil buffers? - answercheck the oil level you are working in a pit 72" deep. what does asme require regarding stop switches? - answer-a second stop switch must be installed 47" above the pit floor what would you use to connect round rails? - answer-bushings you are moving rails to storage. what should be taken into consideration? - answer-floor load capacity
Geschreven voor
- Instelling
- NEIEP 200
- Vak
- NEIEP 200
Documentinformatie
- Geüpload op
- 12 maart 2026
- Aantal pagina's
- 12
- Geschreven in
- 2025/2026
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
neiep 200 final exam questions with complete solut