Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

MKTG 372 FINAL REGO EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026

Beoordeling
-
Verkocht
2
Pagina's
3
Cijfer
A+
Geüpload op
12-03-2026
Geschreven in
2025/2026

MKTG 372 FINAL REGO EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026 Analysis of a PERT problem shows the estimated time for the critical path to be 108 days with a variance of 64. There is a .90 probability that the project will be completed before approximately day: - Answers 118 Economies of scale occur when a company is operating - Answers below its best operating level and increases its output Recall the example of four facilities (A,B,C, D) used in class for which we plotted the corresponding total cost lines for break-even analysis. To plot the cost lines for break-even analysis one end of the line is the y-intercept point. The other line point - Answers Is arbitrary but usually the expected volume Recall the example discussed in class of the restaurant owner who wanted to decide whether to expand small or large. Solving a decision tree that involves maximizing profit (or payoff) includes ______________________. - Answers selecting the decision alternative with the highest expected value A location analysis has been narrowed down to two locations, A and B. The main factors in the decision will be supply of raw materials, which has a weight of 50, and labor cost, which has a weight of 50. The ratings for raw materials and labor are: for A, 3 and 4, respectively; for B, 5 and 3, respectively. Using the factor rating method, the manager should ______________________. A. reject both locationsB. choose location BC. choose location AD. be indifferent between these locationsE. determine the capacity before deciding - Answers choose location B Recall the graph that we used in class to illustrate the concept of economy of scale versus diseconomy of scale.The cost per unit is $36.74 at the best operating level. When the output is higher, the unit cost will be what? - Answers higher Recall the example discussed in class of the bakery that specializes in custom cakes. The maximum output rate that can be achieved by a facility under ideal conditions is _________________. - Answers design capacity Recall the graph used in class to illustrate the concepts of economy of scale versus diseconomy of scale and best operating level. The best operating level is the volume of output that results in the ____________________. - Answers lowest average unit cost If the costs (S and H) and demands (D) are the same, which of the following is not true with regard to the EPQ model as compared to the EOQ model? - Answers Both models use the same formula to compute annual holding cost. In a periodic review inventory system, how many units are ordered? - Answers Target inventory level - on hand balance The formula for calculating safety stock when an estimate of demand during lead time and its standard deviation are known is? - Answers SS = z*σ(dl) Recall the graph of the inventory cost functions. In general, as the order size increases - Answers ordering costs decrease and carrying costs increase. Under a periodic review system, enough inventory must be carried to protect against stockout for the ___________. - Answers replenishment lead time plus the review period What are the two major decisions to be made when using the periodic review system? - Answers the time between orders and the target inventory level A service level of 95% means there is a 0.95 probability - Answers that demand will be met during the lead time The closer the smoothing constant (alpha) is to 1.0 - Answers the greater the reaction to the most recent demand What does the linear regression line do? - Answers Minimizes sum of squared errors What does average number of jobs in the system measure? - Answers WIP inventory A code of ethics especially for project managers - Answers has been established by the Project Management Institute. Ethical issues that may arise in projects large and small include: - Answers A. gifts from contractors. B. exaggerated expense reports C. compromised quality standards to meet bonuses or avoid penalties related to schedules D. pressure to mask delays with false status reports. E. all of the above E is the answer!!!! The estimated variance for an activity with a most likely time (m) equal to 11 days, the optimistic time (a) equal to 6 days , and the pessimistic time (b) equal to 18 days is - Answers 4 days. The sum of the activity times on the critical path determines _____________________. - Answers minimum time to complete the project In making a backward pass through a network, activity L has an activity time of 4 and immediately precedes activities M, P, and T. The late start times for activities M, P, and T are 22, 17, and 27, respectively. The late finish times for activities M, P, and T are 29, 27, and 33, respectively. What is the late start time for activity L? - Answers 13 In making a backward pass through a network, activity L has an activity time of 4 and immediately precedes activities M, P, and T. The late start times for activities M, P, and T are 22, 17, and 27, respectively. The late finish times for activities M, P, and T are 29, 27, and 33, respectively. What is the late finish time for activity L? - Answers 17 Given this information about an activity: ES = 10, EF = 20, LS = 29, and LF = 39. The amount of slack associated with the activity is ____________________. - Answers 19 You may be able to speed up completion of a project by _______________________. - Answers making additional resources available Which of the following is not included in the approach for crashing projects? - Answers Determine which activity requires the most time. A project being analyzed by PERT has 38 activities, 16 of which are on the critical path. If the estimated time along the critical path is 90 days with a project variance of 25, what is the probability that the project will be completed in 88 days or less? - Answers 0.3446 With probabilistic time estimates, when we calculate the expected time for an activity, we treat each activity time estimate as a random variable derived from a ______________ probability distribution. - Answers beta Joe's tower fabrication company client would like to know what the probability is of completing the project in 60 days rather than the 58 estimated days. Based on Z values what is the probability that Joes' tower fabrication will be able to meet the request if the variance is 1.25? - Answers 1.79 Make sure you figure out how to work this problem. A network has been crashed to the point where all activities are critical. Additional crashing: - Answers may require crashing multiple tasks simultaneously The key to spreadsheet model flexibility is to keep all the ___________ of the model separate from the ______________ of the model. - Answers inputs; formulas The estimated mean time for an activity with a most likely time (m) equal to 11 days, the optimistic time (a) equal to 6 days, and the pessimistic time (b) equal to 18 days is - Answers 11.33 What are the most important three dimensions along which a spreadsheet model should be evaluated? - Answers correct, documented, and flexible

Meer zien Lees minder
Instelling
MKTG 372
Vak
MKTG 372

Voorbeeld van de inhoud

MKTG 372 FINAL REGO EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026

Analysis of a PERT problem shows the estimated time for the critical path to be 108 days with a
variance of 64. There is a .90 probability that the project will be completed before approximately day:
- Answers 118
Economies of scale occur when a company is operating - Answers below its best operating level and
increases its output
Recall the example of four facilities (A,B,C, D) used in class for which we plotted the corresponding
total cost lines for break-even analysis. To plot the cost lines for break-even analysis one end of the
line is the y-intercept point. The other line point - Answers Is arbitrary but usually the expected
volume
Recall the example discussed in class of the restaurant owner who wanted to decide whether to
expand small or large. Solving a decision tree that involves maximizing profit (or payoff) includes
______________________. - Answers selecting the decision alternative with the highest expected
value
A location analysis has been narrowed down to two locations, A and B. The main factors in the
decision will be supply of raw materials, which has a weight of 50, and labor cost, which has a weight
of 50. The ratings for raw materials and labor are: for A, 3 and 4, respectively; for B, 5 and 3,
respectively. Using the factor rating method, the manager should ______________________.
A. reject both locationsB. choose location BC. choose location AD. be indifferent between these
locationsE. determine the capacity before deciding - Answers choose location B
Recall the graph that we used in class to illustrate the concept of economy of scale versus diseconomy
of scale.The cost per unit is $36.74 at the best operating level. When the output is higher, the unit
cost will be what? - Answers higher
Recall the example discussed in class of the bakery that specializes in custom cakes. The maximum
output rate that can be achieved by a facility under ideal conditions is _________________. -
Answers design capacity
Recall the graph used in class to illustrate the concepts of economy of scale versus diseconomy of
scale and best operating level. The best operating level is the volume of output that results in the
____________________. - Answers lowest average unit cost
If the costs (S and H) and demands (D) are the same, which of the following is not true with regard to
the EPQ model as compared to the EOQ model? - Answers Both models use the same formula to
compute annual holding cost.
In a periodic review inventory system, how many units are ordered? - Answers Target inventory level
- on hand balance
The formula for calculating safety stock when an estimate of demand during lead time and its
standard deviation are known is? - Answers SS = z*σ(dl)
Recall the graph of the inventory cost functions. In general, as the order size increases - Answers
ordering costs decrease and carrying costs increase.
Under a periodic review system, enough inventory must be carried to protect against stockout for the
___________. - Answers replenishment lead time plus the review period
What are the two major decisions to be made when using the periodic review system? - Answers the
time between orders and the target inventory level
A service level of 95% means there is a 0.95 probability - Answers that demand will be met during the
lead time
The closer the smoothing constant (alpha) is to 1.0 - Answers the greater the reaction to the most
recent demand
What does the linear regression line do? - Answers Minimizes sum of squared errors
What does average number of jobs in the system measure? - Answers WIP inventory
A code of ethics especially for project managers - Answers has been established by the Project
Management Institute.
Ethical issues that may arise in projects large and small include: - Answers A. gifts from contractors.
B. exaggerated expense reports
C. compromised quality standards to meet bonuses or avoid penalties related to schedules
D. pressure to mask delays with false status reports.
E. all of the above
E is the answer!!!!

Geschreven voor

Instelling
MKTG 372
Vak
MKTG 372

Documentinformatie

Geüpload op
12 maart 2026
Aantal pagina's
3
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
joshuawesonga22 Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
97
Lid sinds
1 jaar
Aantal volgers
1
Documenten
14118
Laatst verkocht
5 uur geleden
Tutor Wes

Hi there! I'm Tutor Wes, a dedicated tutor with a passion for sharing knowledge and helping others succeed academically. All my notes are carefully organized, detailed, and easy to understand. Whether you're preparing for exams, catching up on lectures, or looking for clear summaries, you'll find useful study materials here. Let’s succeed together!

3.9

9 beoordelingen

5
4
4
1
3
3
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen