2026/2027 – Construction Quality Management
(CQM) Complete Solutions & Verified Study
Guide
Save
Terms in this set (67)
A cumulative list of job Quality Control Report
deficiencies/rework items can be
found in:
Contractor benefits of CQM Increased profit and production, better
communications, planning, improved
organizational skills, and outstanding performance
evaluations to obtain future contracts.
contractor quality control function To assure that the completed project meets all
quality requirements of the contract.
Purpose of CQM The government's efforts, separate from, but in
coordination and cooperation with the contractor,
assure that the quality set by the plans and
specifications is achieved.
, Two factors cause construction changing markets and increased tech and
industry to become highly regulations
specialized
Factor that will influence both New government regulations, greater influence
government and construction from consumer, improvement in QC and QA
industry in the future requirements, construction-oriented management
info systems, formal partnering involving
stakeholders, more reliance on design-build, more
considerate for live cycle requirements and
increased based incentives
A definable feature of work: Can consist of a combination of multiple
specification sections depending upon the nature
of the work
Actual construction on the jobsite After an interim or final QC is accepted
begins:
All submittals for government Contractor to the Government
approval must be provided by the
_________________ in time to allow for the
review, approval, procurement,
delivery, and performance of
preparatory phase for an item before
it is needed for construction.
An effective contractor quality Be an incentive for work to be done correctly the
control program will first time resulting in earlier completion, reduced
field overhead costs, and greater profits