LGAV 3110 FINAL EXAM STUDY QUESTIONS WITH ACCURATE ANSWERS 1. The _________ department evaluates maintenance requirements and establishes the maintenance program for the airline. Mechanics Maintenance Engineering PP&C - ANSWER Engineering 2. Planning and scheduling the appropriate manpower, parts and facilities are examples of PP&C's _____ function. Forecasting Production Planning Controlling - ANSWER Planning 3. PP&C is primarily responsible for Scheduling daily, 48-hour, and transit checks Ordering parts and estimating the amount of labor needed for unscheduled maintenance Planning and scheduling all aircraft maintenance activity within an airline Providing feedback on completed maintenance jobs - ANSWER Planning and scheduling all aircraft maintenance activity within an airline 4. Schedules for checks and known modifications are finalized in which type of forecast? Long-term Intermediate term Short-Term Extended-term - ANSWER Short-Term 5. This PP&C function is considered an 'idealized' responsibility Forecasting Production Planning Controlling - ANSWER Planning 6. Preliminary planning consists of Implementing maintenance actions Developing the maintenance program by engineering Providing feedback from mechanics to PP&C for more accurate future planning Coordinating with flight operations and group handling - ANSWER Developing the maintenance program by engineering 7. What are the three primary functions of PP&C? Production, Planning, & Control Forecasting, Planning, & Control Maintenance, Planning, & Control Scheduling, Planning, & Control - ANSWER Forecasting, Planning, & Control 8. People who interface with the system are considered Complements to BITE Elements of the system Hindrances to optimal system operation Environmental detriments to aircraft maintenance procedures - ANSWER Elements of the system 9. Who holds the responsibility to address changes or revisions in controlled documents? M&E department FAA Airline Chief Mechanic PIC - ANSWER Airline 10.Tech Pubs maintains a library composed of material created by the Airline Manufacturer FAA A & B A, B & C - ANSWER A, B & C 11.The effectiveness of a system is measured by The minimization of safety-impeding mistakes The productive and cost-effective developments of technology The extent to which the system goals are achieved The number of regulatory requirements that are satisfied in a single system - ANSWER The extent to which the system goals are achieved 12.Human attributes effect How well as system operates Aircraft design and development Communication and error correction All of the above - ANSWER All of the above

Meer zien Lees minder
Instelling
LGAV 3110
Vak
LGAV 3110

Voorbeeld van de inhoud

LGAV 3110 FINAL EXAM STUDY
QUESTIONS WITH ACCURATE
ANSWERS
1. The _________ department evaluates maintenance requirements and
establishes the maintenance program for the airline.


Mechanics
Maintenance
Engineering
PP&C - ANSWER Engineering


2. Planning and scheduling the appropriate manpower, parts and facilities are
examples of PP&C's _____ function.


Forecasting
Production
Planning
Controlling - ANSWER Planning


3. PP&C is primarily responsible for


Scheduling daily, 48-hour, and transit checks
Ordering parts and estimating the amount of labor needed for unscheduled
maintenance

,Planning and scheduling all aircraft maintenance activity within an airline
Providing feedback on completed maintenance jobs - ANSWER Planning and
scheduling all aircraft maintenance activity within an airline


4. Schedules for checks and known modifications are finalized in which type of
forecast?


Long-term
Intermediate term
Short-Term
Extended-term - ANSWER Short-Term


5. This PP&C function is considered an 'idealized' responsibility
Forecasting
Production
Planning
Controlling - ANSWER Planning


6. Preliminary planning consists of


Implementing maintenance actions
Developing the maintenance program by engineering
Providing feedback from mechanics to PP&C for more accurate future planning
Coordinating with flight operations and group handling - ANSWER
Developing the maintenance program by engineering

,7. What are the three primary functions of PP&C?
Production, Planning, & Control
Forecasting, Planning, & Control
Maintenance, Planning, & Control
Scheduling, Planning, & Control - ANSWER Forecasting, Planning, & Control


8. People who interface with the system are considered
Complements to BITE
Elements of the system
Hindrances to optimal system operation
Environmental detriments to aircraft maintenance procedures - ANSWER
Elements of the system


9. Who holds the responsibility to address changes or revisions in controlled
documents?
M&E department
FAA
Airline
Chief Mechanic
PIC - ANSWER Airline


10.Tech Pubs maintains a library composed of material created by the


Airline
Manufacturer
FAA

, A&B
A, B & C - ANSWER A, B & C


11.The effectiveness of a system is measured by


The minimization of safety-impeding mistakes
The productive and cost-effective developments of technology
The extent to which the system goals are achieved
The number of regulatory requirements that are satisfied in a single system -
ANSWER The extent to which the system goals are achieved


12.Human attributes effect


How well as system operates
Aircraft design and development
Communication and error correction
All of the above - ANSWER All of the above


13.Upgrade and Refresher training is


Accomplished on an 'as necessary' basis
Required at regular periods
Mandated by the FAA to ensure mechanics meet minimum safety standards
Conducted independently of HFM and MRM training - ANSWER
Accomplished on an 'as necessary' basis

Geschreven voor

Instelling
LGAV 3110
Vak
LGAV 3110

Documentinformatie

Geüpload op
13 maart 2026
Aantal pagina's
46
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
DrSammuel

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
DrSammuel TeachmeTutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
4
Lid sinds
4 maanden
Aantal volgers
0
Documenten
605
Laatst verkocht
5 dagen geleden
Turning Preparation into Achievement.

Welcome to my study resource hub! This account provides high-quality exam papers with clear and detailed elaborations designed to help students fully understand each topic and pass with confidence.

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen