2026 FULL VERIFIED Q&A PASSED
⩥ Variance at Completion (VAC). Answer: A projection of the amount of
budget deficit or surplus, expressed as the difference between the budget
at completion and the estimate at completion.
= BAC - EAC
⩥ Earned Value Management (EVM). Answer: A project performance
measurement technique that integrates scope, time, and cost data
Line graph illustrating PV, AC, EV
⩥ Developing a Quality Plan. Answer: Conformance
Client Satisfaction
Client Value
Client Supplier
⩥ Conformance Quality. Answer: First Step includes physical quality,
test results, neatness and workmanship (plan, do, check, act)
⩥ Client Satisfaction Quality. Answer: A measure of the client's
perception of the proccess and benefits received from survey
,⩥ Client Value Quality. Answer: Relationship between cost and quantity
Compares results of competition
Benchmark their performance
⩥ Client Supplier Model. Answer: Contractors provide outcomes to
client to understand client needs.
⩥ Develop Communication Plan. Answer: Project team should develop
communication as part of the overall project plan
Amount of time spent on planning varies depending size, complexity
and risk
⩥ Contents of Communication Plan. Answer: Should address protocols
of status, change order, completion reports via email, whiteboard or
meetings
⩥ Daily activities should be logged in a __________ and includes a
________ look ahead, produced every week. Answer: diary form , 2-3
week
⩥ At the initial stage of construction the GC typically holds two
meetings. Answer: 1) With Owner and Design Team
2) Field Personnel and subcontractor
, ⩥ Kickoff Meeting. Answer: GC will typically conduct a meeting used
to initiate the start of the project; typically attended by all the key
stakeholders and contractors; can be done when Initiating or Planning is
complete depending upon the organization
⩥ Commissioning. Answer: Ensuring systems designed/ installed/
tested/ capable of operating and maintaning according to the intent
Also provides testing of failure modes which cannot be performed once
system is in operation
⩥ Phases of Commissioning Process. Answer: Program
Design
Construction
Acceptance
Post-Acceptance
⩥ Commissioning Program Phase. Answer: Establish the design's intent
Identify team and system to be commissioned
Develop commissioning log
Most important step
⩥ Commissioning Design Phase. Answer: Design is completed and
Documents are completed