Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ICC Prestressed Concrete - Codes and Plans Certification Preparation with all Correct & 100% Verified Answers |Already Graded A+

Beoordeling
-
Verkocht
-
Pagina's
11
Cijfer
A+
Geüpload op
17-03-2026
Geschreven in
2025/2026

ICC Prestressed Concrete - Codes and Plans Certification Preparation with all Correct & 100% Verified Answers |Already Graded A+

Instelling
Building
Vak
Building

Voorbeeld van de inhoud

ICC Prestressed Concrete - Codes and Plans
Certification Preparation with all Correct & 100%
Verified Answers |Already Graded A+

Module 1. Prestressed concrete is: ✔Correct Answer-- The tensioning of steel-stranded cables prior
to concrete placement
- The tensioning of steel-stranded cables after concrete has been placed and hardened
- Concrete that has received a tensile load prior to any service loads

Module 1. The use of a prestressed concrete system will achieve the following: ✔Correct Answer--
Reduced thickness of concrete, less conventional reinforcing steel and adequate crack control

Module 1. Once tensioned, the tensioning cables are held securely in a tensioned state by:
✔Correct Answer-Wedges that have been seated

Module 1. The end of a cable that terminates within a concrete slab, thus rendering it in accessible
from outside the concrete is known as: ✔Correct Answer-The dead end

Module 1. The presence of sheathing on a wire-stranded cable indicates that: ✔Correct Answer-It
will be used in an unbonded system application

Module 1. The most common post-tension cable tendons in use today are made up of: ✔Correct
Answer-7 steel strands of wire wrapped together

Module 1. In an unbonded system, the force applied to the concrete after tensioning: ✔Correct
Answer-Comes from the anchorage zone only

Module 2. Post-tension manufacturing plants must be certified by: ✔Correct Answer-PTI
Unbonded Plant Certification Program

Module 2. Prior to cutting the tendon tails after tensioning, the field records of stressing activities
must be forwarded to and approved by: ✔Correct Answer-The engineer of record

Module 2. In the event that a new set of stressing equipment is delivered to the project, this
equipment should contain __________ for review prior being used on-site: ✔Correct Answer-A
current calibration chart relating gauge pressure to force applied

Module 2. According to the Field Procedures Manual for Unbonded Single Strand Tendons, all of the
following items are necessary for post-tension document control except:
A) Concrete Strength Results
B) Shipping Lists
C) Material Certifications
D) Approved Installation Drawings ✔Correct Answer-A) Concrete Strength Results

Module 2. When reporting stressing results, the following information is necessary to record:
A) Jack and gauge serial number
B) Elongation measurements and percentage deviation
C) Both A and B

, D) Gauge Manufacturer
E) All three, A, B, and D ✔Correct Answer-C) Both A and B

Module 2. When moving post-tension cables across the site, the use of _______ is permitted.
A) Nylon slings, with unloading as close as placement as possible
B) Smooth finished chains with limited use
C) Epoxy coated high strength wire with limited use
D) A large front loader exercising caution ✔Correct Answer-Nylon slings, with unloading as close to
the placement as possible

Module 2. When storing post-tension cables, care must be taken to: ✔Correct Answer-Prevent the
cables from being exposed to weather elements and moisture

Module 2. During deliver, it is the ______________ responsibility to ensure the delivered items
match the shipping list. ✔Correct Answer-Buyer's

Module 2. According to the Field Procedures Manual for Unbonded Single Strand Tendons, the follow
documents must be kept on site: ✔Correct Answer-1) Approved Installation Drawings
2) Shipping Lists
3) Material Certifications
4) Jack Calibrations
5) Stressing Records

Module 2. Install drawings show: ✔Correct Answer-Plan views, elevation views, and details so the
subcontractor and inspector can clearly see the tendon layout. This includes tendon profiles, also
known as drape.

Module 2. Drape ✔Correct Answer-Tendon profiles

Module 2. Material Certifications ✔Correct Answer-Documents that describe the cables' physical
properties and factory testing results.

Module 2. Stressing records, written by the inspector, should include: ✔Correct Answer-- Location
of tendons stressed (grid line to grid line)
- Type of tendons stressed (banded, uniform, beans, temperature)
- Gauge/jack used
- Date, time, and weather during stressing
- Stressing crew
- Elongations based on a traceable numbering system
- Any deviations from tolerances

Module 2. As an inspector, you should immediately check for ____________ when you see the
stressing equipment. I.e., not on the day of stressing. ✔Correct Answer-Jack Calibration Records

Module 3. On a two-way flat plate, a minimum of ___________ over each column first.
A) 2 uniform tendons should be placed
B) 1 group of banded tendons should be placed
C) 50% of the bottom bars should be placed
D) (3) #5 support bars should be placed ✔Correct Answer-A) 2 uniform tendons should be placed

Geschreven voor

Instelling
Building
Vak
Building

Documentinformatie

Geüpload op
17 maart 2026
Aantal pagina's
11
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Stuvia2026 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
22
Lid sinds
1 jaar
Aantal volgers
1
Documenten
5214
Laatst verkocht
2 weken geleden
\"Your trusted Hub for Academic Excellence\"

Stuvia 2024 is your trusted destination for top-tier study materials, including high-quality exams, assignments, and verified answer keys. Our content is crafted for excellence thorough, up-to-date, and tailored to help students succeed in their academic journey. Whether you\'re preparing for a final exam or need support with coursework, every document in our store is designed to provide clarity, accuracy, and confidence. At Stuvia 2024, academic success starts with the right resources.

Lees meer Lees minder
2.3

3 beoordelingen

5
0
4
0
3
2
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen