100% CORRECT ANSWERS ALREADY GRADED A+||
LATEST AND COMPLETE UPDATE 2025
written by
MBOFFIN
The Marketplace to Buy and Sell your Study Material
At Stuvia, you will find the best notes, summaries, flashcards & other study material. Search for your school or uni and find
the study material you need.
www.stuvia.com
Downloaded by: MBOFFIN | Want to earn $1.236
Distribution of this document is illegal extra per year?
, Stuvia.com - The Marketplace to Buy and Sell your Study Material
1 | P a g e
QSP EXAM [ACTUAL EXAMS 1-6] ALL QUESTIONS
AND 100% CORRECT ANSWERS ALREADY GRADED
A+|| LATEST AND COMPLETE UPDATE 2025
Certain non-storm water discharges may be necessary for the completion of construction
projects. Therefore the General Permit authorizes such discharges provided they meet the
following conditions except:
a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or nuisance - ANSWER:
e. Causes or threatens to cause pollution, contamination, or nuisance
Hydrologic source controls are a design technique that minimize and/or slow the rate of
stormwater runoff from the site. Examples include:
a. Reduction of pervious surfaces
b. Use of landscaping as a storm drain treatment feature
c. Drain rooftop downspouts to impervious areas
d. Stormwater treatment facility - ANSWER: b. Use of landscaping as a storm drain
treatment feature
If the R Factor is , you can apply for the Erosivity Waiver.
Downloaded by: MBOFFIN | Want to earn $1.236
Distribution of this document is illegal extra per year?