| WITH COMPLETE SOLUTIONS.
What is the most important - that a munition not react violently in an accident
situation? Answer - Injury to U.S. Personnel
(correct)
Which two of the following are the likely result of the failure of a CSI? Answer -
-Significant equipment damage
-An Engineering Investigation
(incorrect)
Low market demand is one reason a shortage of supplies could happen.
Answer - True
(correct)
The next step once affordability constraints have been determined is: Answer -
Perform an affordability analysis
(correct)
Which of the following is not a benefit of proper planning for corrosion
prevention? Answer - Reduced Mean Logistics Delay Time
(incorrect)
,Which of the following should be done for the corrosion prevention and control
plan? Answer - Engage human systems integration experts
(incorrect)
Threats are reported in ____________. Answer - STAR
(incorrect)
Which step of Managing Information & Communication Technology in
Acquisition validates vendor claims against your stated accessibility
requirements? Answer - Step 2 - Conduct Market Research
(incorrect)
Which of the following would NOT be a good candidate for a COTS solution?
Answer - Aircraft carrier
(correct)
Safety, Human Factors Engineering and Personnel are three of the seven
interdependent domains of HSI Answer - True
(correct)
Select the primary reference to follow when implementing ESOH. Answer -
MIL-STD-882
(correct)
The technical advisor should document insensitive munitions in a way that
helps: Answer - Avoid violent reactions in an accident situation
(unverified)
, ______ is the act of getting rid of excess, surplus, scrap, or salvage property
under proper authority. Answer - Disposal
(correct)
Which of the following is the first step in the DOD COTS acquisition selection
process? Answer - Understand the need and application
(correct)
Who produces the VOLT? Answer - Intelligence analysts
(correct)
Developmental Testing may require an ESOH event risk assessment. Answer -
True
(correct)
When should affordability influence design choices? Answer - At the very
beginning of the program
(correct)
Partnering with industry to develop/adopt counterfeit prevention standards is
one option of which mitigation activity? Answer - Prevention
(correct)
Once an ESOH hazard or risk has been identified and documented, select the
next step among the eight elements of systems safety the SE shall proceed
with. Answer - Assess and document risk
(correct)