S12 sprinkler test | New 2025/ 2026 Update |
Questions and Answers | GRADED A
(Verified Solutions).
.
Question:
THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO
DETERMINE QUALIFICATIONS.
Answer:
OWNER
Question:
RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES
FOR A MIN. OF __________ YEARS.
Answer:
3
Question:
THE BUILDING OWNER SHALL ASSIGN A(N) ____________ TO COMPLY WITH
REQUIREMENTS.
Answer:
IMPAIRMENT COORDINATOR
x
.
, REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN ________
FLOOR(S) ARE CONSIDERED PLANNED REMOVAL FROM SERVICE.
Answer:
1
Question:
SHUTDOWNS AFFECTING MORE THAN _________ FLOOR(S) ARE CONSIDERED
UNPLANNED OUT OF SERVICE CONDITIONS.
Answer:
1
Question:
NOTIFICATION TO FDNY IS NOT REQUIRED, PROVIDED SYSTEM IS RETURNED TO
SERVICE WITHIN ______ HOURS.
Answer:
8
Question:
FOR UNPLANNED REMOVAL FROM SERVICE, THE COF HOLDER SHALL
IMMEDIATELY REPORT CONDITION TO THE ___________ AND THE FIRE DEPT.
Answer:
OWNER OF THE BUILDING
x
.
, Question:
IF A MINOR DEFECT IS OBSERVED, IT SHALL BE CORRECTED WITHIN _________
DAYS OR IT WILL BE CONSIDERED AN IMPAIRMENT.
Answer:
30
Question:
WHAT DOES "OOS" STAND FOR?
Answer:
OUT OF SERVICE
Question:
OOS SYSTEMS SHALL BE IDENTIFIED BY PLACING ________ AT FIRE DEPT.
CONNECTIONS, SYS. CONTROL VALVES, AND FIRE COMMAND CENTER Answer:
TAGS
Question:
A _______ SHALL BE REQUIRED TO POST TAGS AT MAIN CONTROL VALVE AND
ANY SECTIONAL VALVES.
Answer:
MASTER FIRE SUPPRESSION PIPING CONTRACTOR
__________ SHALL BE POSTED ON THE TAG INDICATING BOTH STATIC AND FLOW
PRESSURES BEFORE AND AFTER.
x
.
, Answer:
DRAIN TEST RESULTS
Question:
GREEN TAGS INDICATE THAT __________.
Answer:
NO IMPAIRMENT WAS FOUND
Question:
GREEN TAGS WILL BE PLACED ON THE ____________.
Answer:
MAIN CONTROL VALVE
Question:
SYSTEMS PARTIALLY OR FULLY OUT OF SERVICE SHALL HAVE A ____________
TAG PLACED ON THE MAIN CONTROL VALVE.
Answer:
RED
Question:
A _________ DISC OF 8-9 INCHES SHALL BE PLACED ON CONNECTIONS TO
INDICATE THE SYSTEM IS FULLY OUT OF SERVICE.
Answer:
x
.