Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

FDNY COF P-98|Questions and answers | Updated RATED A+ | NEW 2026

Rating
-
Sold
-
Pages
27
Grade
A+
Uploaded on
17-03-2026
Written in
2025/2026

FDNY COF P-98|Questions and answers | Updated RATED A+ | NEW 2026FDNY COF P-98|Questions and answers | Updated RATED A+ | NEW 2026FDNY COF P-98|Questions and answers | Updated RATED A+ | NEW 2026FDNY COF P-98|Questions and answers | Updated RATED A+ | NEW 2026FDNY COF P-98|Questions and answers | Updated RATED A+ | NEW 2026FDNY COF P-98|Questions and answers | Updated RATED A+ | NEW 2026

Show more Read less
Institution
FDNY COF P-98
Course
FDNY COF P-98

Content preview

FDNY COF P-98|Ques ons and answers | Updated
RATED A+ | NEW 2026

1.- Where generally Fuel-oil is used in buildings?

What purposes?

Is used in Sta onary Equipment

Two purposes:

a) Fuel Emergency Generators

b) Fuel Equipment used to heat the building

2.- What COF is required to supervise the Fuel-oil transfer in the building from one floor to
another?

- P-98 and maintain all qualifica ons and comply w/ requirements applicable to such
cer ficate holder

- The P-98 COF is premise-related

3.- The use of the word should refers to:

Policies, procedures and/or best prac ces recommended by the FDNY, and may not be a
codified requirement.

4.- The use of the word shall refers to:

Requirement of the Fire Code or the FDNY

5.- Supervision of Fuel-Oil Piping & Storage Opera)on

Shall be under the GENERAL SUPERVISION of P-98:

A sta onary fuel-oil storage tank, related piping, that is installed on the lowest floor of the
building and transfer fuel-oil through piping to another sta onary fuel-oil storage tank, or
fuel burning equipment, installed above such floor

7.- Maintenance Requirements

Fuel-oil storage tanks and piping shall be inspected for any evidence of leaks

Weekly

,6.- Supervision of Fuel-Oil Piping & Storage Opera)on Shall be under the PERSONAL
SUPERVISION of P-98 COF

Periodic Inspec on and Tes ng of tanks and piping

8.- Maintenance Requirements

Fuel-oil storage tanks shall have their float switches tested to ensure that they are in good
working order at least

Weekly

9.- Licences & Cer)ficates

No oil burning equipment may operated un)l

a) Cer ficate of Compliance has been issued by NYCDOB

b) Air pollu on control code requirements NYCDEP

c) Permit for the Storage & use of fuel-oil issued by FDNY

10.- Licences & Cer)ficates

Pursuant to the New NYC Fire Code & Mechanical Codes stated that

The COF is required for all exis ng and new buildings where fuel is being transported from the
lowest levels to tanks or equipment on upper floors

11.- Oil Circula)on in the System

Diagram #1

The process of oil circula on from the tank at the lowest floor of a building to the burner on
the floor above such floor through the pump.

12.- Oil Circula)on in the System

Oil storage tank

Provides the supply of oil for combus on in the oil burner. It is inside a dike. In case of a leak
the diked area will contain the oil. In its normal condi on, #2 fuel-oil is thin and light and is
easily pumped through the circula on system

13.- Oil Circula on in the System
A Suc on pump

, Circulates the oil throughout the system. Dirt and sediment are present in the fuel-oil coming
from the oil storage tank. The oil filter removes most of these contaminants from the oil
before the oil reaches the burner's strainer.

14.- Oil Circula)on in the System

The Suc)on Line

Has to be 6 inches from the bo?om of the tank for sediments not to be absorbed. The vacuum
gauge is a device that measures pressure below atmospheric pressure. Excessive vacuum
readings indicate that there is an obstruc on in the suc on line (such as dirty oil strainer).
When this occurs the flow of oil can be stopped by closing the shut-off valve. This permits the
operator to clean the filter/strainer or to perform other maintenance

15.- Oil Circula)on in the System

Main Fuel Valve

Electrically operated and will open or close the line leading to the atomizer only for oil
burners. It will shut down the burner system if there is a failure of igni on or combus on.

16.- Oil Circula)on in the System

A Back Pressure Relief Valve

Oil circulates through the piping system back to the storage tank through the oil return line. A
back pressure relief valve is provided for safety if the pressure becomes too great. Day tanks
may be located throughout the building above the lowest floor

17.- Oil Circula)on in the System

A Separate Pump

Required for each day tank to supply each floor. In case of a leak in the piping, leak collector is
provided. Leak collector is stored by the storage tank. It has a oil level gauge which shows the
amount collected

18.- Oil Circula)on in the System

Level Gauge

A gauge will show how much fuel oil is inside a main storage tank/day tank.

19.- Oil Burner Opera)on

Combus)on

Written for

Institution
FDNY COF P-98
Course
FDNY COF P-98

Document information

Uploaded on
March 17, 2026
Number of pages
27
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STUVEX NURSING
Follow You need to be logged in order to follow users or courses
Sold
803
Member since
2 year
Number of followers
315
Documents
16231
Last sold
5 days ago
STUVATE - STUVIA USA

My store is a comprehensive destination for buying and selling a variety of documents. we offer a vast range of documents that cater to different needs and requirements, our documents are well-researched, accurate, and of high quality, ensuring customer satisfaction. whether you are looking for legal documents, academic papers, business reports or miscellaneous documents we`ve got you covered.

3.8

124 reviews

5
49
4
32
3
24
2
7
1
12

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions